Laserfiche WebLink
amecO <br />Earth & Environmental <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture-Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue placing structural fill within the Phase 5 VLF footprint. <br />Continue processing SLF material at the East Cresson Clay Borrow. <br />Continue receiving geomembrane to site. <br />Continue subgrade preparation for SLF placement. <br />Continue SLF placement within the Phase 5 VLF footprint. <br />Continue geomembrane installation within the Phase 5 VLF footprint. <br />Continue PSSA ore slope construction. <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V.• <br />CC&V held a Weekly Construction meeting on July 6, 2010. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />AMEC. <br />None <br />Others: <br />None <br />Summary of Incidents/Accidents/Health & Safety Issues: <br />None <br />We trust the information provided clearly represents our findings and observations for the week ending <br />July 10, 2010. <br />Joseph D. Hickey, CQA Monitor Date: July 10, 2010 <br />Approved By: //S - Date: <br />?lip /z <br />VLF Weekly Report WE 07.10.10.D