amec'O <br />Earth 8 Environmental <br />C) Overburden to Stockpile <br />1) VLF <br />Oversize rock within the Phase 5 VLF fill area was removed from fill/cut areas and hauled to <br />the overburden stockpile area east of the east perimeter road near stations A29+00 (+/-) to <br />A32+00 (+/-) right of centerline. <br />D) Cut to Fill <br />1) VLF <br />Structural fill placement was performed between stations E 16+00 (+/-) and E23+00 (+/-), <br />approximately 0 to 200 feet right of centerline and between stations C2+00 (+/-) and C7+50 <br />(+/-),approximately 0 to 100 feet right of centerline. Cut/fill operations were performed using <br />various CAT dozers and excavators. Structural fill was placed in 18" to 24" lifts. Each lift was <br />moisture conditioned using a CAT 773 water truck (when necessary) and compacted using a <br />10-ton vibratory smooth drum compactor, passing over the entire fill surface at least 4 times <br />(method compaction technique was applicable). <br />E) Soil Liner Fill <br />1) VLF <br />The area between stations F0+00 (+/-) and F10+00 (+/-), approximately 0 to 40 feet left of <br />centerline was reworked using a skid steer loader, a tandem axle water truck, and vibratory plate <br />compactor. This includes the backfilled PSSA anchor trench. Nuclear density testing, moisture <br />verification, and depth checks were performed in area. All test results were within project <br />specifications and all test locations were surveyed by Ames. <br />F) PSSA Ore Slope Construction <br />1) VLF <br />No work performed during the week. <br />G) Low Volume Solution Collection System <br />1) Low Volume Solution Collection Piping <br />No work performed during the week. <br />2) Low Volume Solution Collection Fill (LVSCF) <br />Finishing of the previously placed LVSCF surface was performed using a CAT D-6 LGP dozer <br />and a (:AT skid steer loader. LVSCF placement was not performed during the week. <br />H) Material Processing <br />1) East Cresson Clay Borrow Area <br />Processing of SLF material continued this week. A CAT 320 excavator, a CAT 330 excavator, <br />a CAT 950 front-end loader, and tandem-axel haul trucks were used to excavate, haul, and <br />process the material. <br />VLF Weekly Report WE 07.10.10.D <br />