Laserfiche WebLink
StaUQn;ID . N_o tn. En 3i , Elegy at op' S & A , ?du a Code <br />SW-AWD 734870.0 2059850.0 6640 Above Waste Dump above site 1,2 <br />SW-A001 733673.6 2061141.4 6591 Above Discharge outfall 001 1,4 <br />SW-DO01 733406.0 2061299.0 6585 Old water treatment plant discharge N/A terminate <br />SW-BDIS 733336.2 2061476.3 6577 Below Discharge outfall 001 1,4 <br />SW PL 733088.7 2061744.4 6564 Parkin Lot 1,4 <br />SW-OS 732902.1 2062102.4 6552 Ore Sorter 1.4 <br />SW-BOS 732696.8 2062307.1 6533 Below Ore Sorter 1,4 <br />SW-GS 732466.7 2062546.2 6533 Guard Shack 1,4 <br />DIS-DO03 732430.0 2062563.0 6540 New water treatment plant discharge 5, 6, 7 <br />SW-BPL 732144.4 2063063.8 6509 Below Property Line just below ate 1,2 <br />SW-FBRG 731790.0 2063720.0 6460 First Bride downstream 3,4 <br />SW ARH 729690.0 2064180.0 6358 Above Red Hill downstream 3.4 <br />SW-LLHG 726940.0 2065740.0 6155 Lon Lake Head Gate downstream 4 <br />SAMPL/A/G B ANAL YS/S SCHEDULECDDES <br />Stream 4 males <br />1 -WRF?kl?c [Uranium (dissolved); Field measurement of Temp, pH, and Conductivity] <br />2 - MonthlX [Table 1 Extended Suite] <br />3 - Month q[ [Uranium (total & dissolved); Re-226 (total & dissolved); Field measurement of Temp, pH, and Conductivity] <br />4 - Ounrlerly [Table 1 Extended Suite] <br />Water Trentment DischnrogRnmples <br />5 - Weekly [Uranium (total & potentially dissolved); Radium 226+228 (total); Field measurement of pH, Oil and Grease (visual)] <br />6-Month l)t [Table 2 Extended Suite] <br />7 - Oue[Ierl?t [WET testing for Ceriodaphnia dubia (as opposed to "species") - 3 compositesAest] <br />Stream Sample Collection and Preparation <br />S&A SCHEDULE CODE 1: STREAM WATER <br />SAMPLE COLLECTION d PREPARATION <br />t' <br />0.5 Liter Filtered I HN03' I ICE <br />"Acidify to pH 2 <br />S&A SCHEDULE CODE 3: STREAM WATER <br />SAMPLE COLLECTION & PREPARATION <br />7 F3Liters 7FFilteeredd / HN03` /ICE <br />2 Liters Unfiltered / HN03' / ICE <br />TABLE 1 EXTENDED SUITE: STREAM WATER <br />IZAAM F COLLECTION & PREPARATION <br />w <br />1 Gallon <br />Filtered / HN03` / ICE <br />1 Liter Filtered / ICE <br />1.25 Gallons Unfiltered / HN03' / ICE <br />1 Gallon Unfiltered / ICE <br />1 Liter Unfiltered / H2S0; / ICE <br />0.5 Liter Unfiltered / NaOH' / ICE <br />'acidify to pH 2 <br />-Add base to pH 92 <br />`Acidify to pH 2 <br />Water Treatment Discharge Sample Collection and Preparation <br />TABLE 2 EXTENDED SUITE: DISCHARGE <br />CAUR F r01 r FMON & PREPARATION <br /> <br />2 Liters Filtered / HN03" / ICE <br />0.5 Liters Filtered / ICE <br />3 Liters Unfiltered / HN03* / ICE <br />1 Liter Unfiltered /ICE <br />0.5 Liter Unfiltered / H2SO; / ICE <br />0.5 Liter Unfiltered / NaOH' ! ICE <br />S&A SCHEDULE CODE S: DISCHARGE <br />SAMPLE COLLECTION & PREPARATION <br />3 Liters Unfiltered / HN03' / ICE <br />"Acidify to pH 2, be sure to notify lab of acidification <br />date and specify "potentially dissolved" for <br />uranium analysis <br />'Acidify to pH 2 <br />"Add base to pH 12