Laserfiche WebLink
;SENT f TyF U. S. DEPT. OF THE INTERIOR Olt -1y, <br /> A OFFICE OF SURFACE MINING <br /> Mine Site Evaluation <br /> sq State Program /O�OFSURFAG��`� <br /> 1.Permittee/Person 'RS 9. Permit Number 10. Permit Type <br /> KERR COAL 0 C-006-80 PP <br /> 2.Address 11. Field Visit Date 12. Purpose 13. SRA Present <br /> PO BOX 459 v`.r.'ti S 05/26/2010 O� N❑ <br /> State mm-dd -yyyy <br /> 3. City O I '�n�ng 4. 14. Permit Status 15. Site Status 16. Facility Type <br /> Florence CO <br /> BR MC AEFL <br /> 5. Zip Code 6. Phone Number <br /> 17. OSM Office# 18. CCID# 19. Land Code <br /> 81226 (719)784-6395 <br /> 140 SF <br /> 7. Operator Name,if Different than Permittee <br /> 20. M.S.H.A ID# 21. State Abrev. 22. County Name <br /> 05-02674 CO JACKSON <br /> 8. Mine Name <br /> 23. AVS Permittee Entity ID Number 24. State Office <br /> MARR STRIP <br /> 056814 i I L <br /> 25. Hours 26. Signature Block 27. Reviewing Official: <br /> 6.0 a. Permit Review c 2,� ;?- .,'//e _ -) (GIvc <br /> 1.5 b. Site Visit Time Signature: Signature: <br /> Christine Belka ID#182 <br /> 7.0 c. Travel Time Printed Name: Review Date: I 1 l/ 02J <br /> mm-dd-yyyy <br /> 3.0 d. Report Writing Date: 06/01/2010 Is Supplemental MSE Page Used Y/N ED <br /> Permit Type -Item 10 IP=Interim Program, PP=Permanent Program , NP=No Permit <br /> Purpose Type Codes Item 12 CCR....Citizen Complaint Referral(non site visit) <br /> 0xx....Oversight RFx.... Reclamation Fees CC......Citizen Complaint(initial site visit) <br /> Axx....Assistance Fxx..... Federal Actions CCF....Citizen Complaint Follow-up <br /> Joint Inspection-Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br /> Permit Status-Item 14 AB....Abandoned:All surface and underground coal mining activities have ceased and <br /> operator has left the site without completing reclamation as defined in <br /> A.... Active:Coal mining and reclamation activities occurring or 30 CFR 840.11(g) <br /> ppermitted but not yet disturbed. AB1..Bond Forfeiture: Bond forfeiture officially in process or completed,and. <br /> IN....Inactive(Permanent Program Permit):Phase 11 completed or reclamation in progress or not yet commenced. <br /> Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br /> Coal mining completed and reclamation activities initiated. used to reclaim site,but site not reclaimed to Program standards. <br /> BR•••Bond Release: Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br /> Authority(RA)has released all of the bond(Phase III Release.) NA...Not Applicable:When site is unpermitted. <br /> Site Status Codes-Item 15 NS..Non-Site Visit:Status of site not determined. <br /> ND...No Disturbance: No coal mining and reclamation MC..Mining Complete:No mining activity on site, FP..Forfeiture Pending:The RA is pursuing <br /> operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br /> EX..Coal Exploration:Coal exploration operations TC..Temporary Cessation:The RA has granted performance bond(s),and/or reclama- <br /> have started and where coal mining operations cessation of mining pursuant to 30 CFR 816/ tion of forfeited site is in progress. <br /> have not begun. 817.131(b). FR..Forfeited and Reclaimed: Forfeiture <br /> AP..Active Coal Producing:Coal surface mining Pi...Phase I Release: At least Phase I bond release reclamation completed. <br /> activities are occurring. granted for entire permitted area. For interim FO..Abandoned Site:Abandoned site that <br /> AN..Active Non-Producing:Active non-producing permits,partial bond release. is permitted but there is no bond. <br /> facility such as tipple or preparation plant. P2..Phase 11 Release: At least Phase II bond release WC.WiIdcat: Coal mining and reclamation <br /> NM..No Mining: The Permit Status is active,site is for the entire permitted area. operations have or are taking place and <br /> not in Temporary Cessation, no surface coal P3..Phase III Release: Reclamation completed and the activity is not covered by the <br /> mining activity,and site not regraded. the RA has released all bond. required permits from the RA. <br /> Facility Type Codes-Item 16 D...Ancillary(Haulroad, Conveyor,and/or Rails) H...Exploration Permits L...Remining site permitted <br /> A... Surface E...Refuse and/or Impoundment 1... Notice of Intent to Explore under 30 CFR785.25 <br /> B... Underground F...Loading Facility and/or Tipple J...Exempt 16 and 2/3 <br /> C... Preparation Plant G...Stockp9es K...Government Financed Construction Exemption <br /> Small Business Regulatory Enforcement Fairness Act (SBREFA) <br /> Your Comments Are Important <br /> The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br /> small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each agency's <br /> responsiveness to small business. If you are a small business(a business with 500 or fewer employees including those of affiliates) Page 1 of <br /> and wish to comment on the enforcement or compliance activities of OSM,call 1-888-REG-FAIR(1-888-734-3247). Rev sed December 4,1998 <br />