Laserfiche WebLink
i <br />Effective Stress Path Analysis - p'-q Regression Plot <br />Venture Resources,Hukill Gulch Millsite„Coarse Fraction,A,B&C, <br />i <br /> <br />I <br />20 <br />1 <br />F <br />I? <br />I <br />I- <br />LL c <br />a 10 - <br />r-- <br />j <br />i <br />I <br />I <br />t- <br />I <br />I <br />• <br /> i <br />I <br /> <br />• i <br /> <br />i <br />i <br />• <br />I 0 5 10 15 20 <br />Thousands <br />' {PSFJ <br /> <br />• NOTE: Peak points are plotted for visual verification only. Least squared regression <br />- analysis, yields a negative alpha (a) value; therefore no regression analysis has been provided.