Laserfiche WebLink
• g. Identification of Discharges other than Stormwater: It is clearly understood that no discharges, <br />except stormwater, are allowed in the structures and systems described within this Stormwater <br />Management Plan. During inspections, it shalt be verified that no process water is inadvertently <br />discharging into the stormwater system. The only exception to this is any water deployed during fire <br />fighting activity. <br />5. Comprehensive Inspection: Venture Resources has selected Ryan J. Mellale, PE as their SWMP <br />Administrator. McHale is a registered CO Professional Engineer and the Company's Vice President overseeing <br />operations. McHale can be contacted at 303-619-6323 or ventureresourcesf7att_net. McHale will also be <br />responsible for conducting and maintaining the periodic inspections and reports outlined in this SWMP. <br />In the spring and fall of each year, a thorough inspection of all of the stormwater system components delineated <br />in the BMP's section shall be performed. Additionally, material storage and stockpile areas shall be inspected <br />for evidence of any potential pollutants entering the stormwater system. Erosion and sedimentation controls <br />shall also be inspected. <br />The results of these inspections shall be contained in the Annual Report. <br />6. Consistencv with Other Plans: Venture Resources has developed a very thorough operating and reclamation <br />plan with the Colorado Division of Reclamation, Mining and Safety (DBMS) that can be found within the <br />permit documents of M-2009-076. <br />.7 <br /> <br />Page 10 of 10