My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-27_PERMIT FILE - M2009076 (12)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009076
>
2010-07-27_PERMIT FILE - M2009076 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:16:50 PM
Creation date
7/29/2010 2:59:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009076
IBM Index Class Name
PERMIT FILE
Doc Date
7/27/2010
Doc Name
Adequacy Response, Ex. C- Mining Plan
From
Venture Resources
To
DRMS
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • Diversion Ditch -A trapezoidal channel with a bottom width of 6 feet, side slope of 1:1 and a minimum clear <br />depth of 2 feet shall be constructed at each end of the impoundment bench as it is raised, at the intersection with <br />the natural grade, to provide a permanent stormwater control. Type L riprap, sized nominally with a median <br />diameter of D50=9 inches, shall be hand placed at a depth of 18 inches. Rubble and/or slightly weathered stone <br />sorted on-site from available material that meets this size specification shall be acceptable for use. <br />This perimeter ditch will be constructed in phases as the impoundment expands. Refer to Exhibit E Drawing E7 <br />for the Phase 1 ditch and Drawing E10 for Phase 2 ditch. Interim diversion along the projected side slope line, <br />prior to raising an impoundment bench, shall be achieved by utilizing woven polypropylene sand bags <br />(nominally 14"x26" 50# capacity) stacked two bags wide as the first course and one bag wide, centered, as the <br />second course. The sandbags shall be removed as permanent riprapped channel is installed. Refer to Exhibit E <br />Drawing E13 for construction details. <br />The existence of a natural diversion channel will also be acceptable for stormwater diversion as is found near <br />the bottom half of the impoundment area. This natural channel is incorporated into the sedimentation pond. <br />This system is capable of passing a 100 year/ 24-hour storm event (3.8" as reported by NOAA Atlas 2, Vol. III). <br />The Tailings Impoundment shall also be constructed to maintain a minimum of one (1) foot of freeboard between <br />the ponded area of process water collection and the rising embankment face. This will be sufficient to contain a 100 <br />year/24-hour event that falls inside the Diversion Ditch perimeter. A significant level of safety above and beyond <br />the containment requirement of a 10 year/24-hour event. Refer to Exhibit B for a description of the Temporary <br />Substitution Water Plan to account for capturing any of this rainfall in the lined area of the impoundment. <br />Also during a 1.00 year/24-hour event, a Peak Discharge into the Sedimentation Collection Pond will be produced in <br />the amount of +/- 96.3 cfs. <br />• Stormwater/Sedimentation Collection Pond - This structure is designed to collect stormwater runoff from the <br />Tailings Impoundment Affected Area and allow any carried sediment a chance to settle for future removal. A <br />• rip-rapped discharge weir (12' long x 2' deep) is more than capable of passing this peak flow. Sizing has been <br />done to allow for containment and settling of a 10 year/ 24-hour storm event (Peak Discharge = +/- 41.0 cfs) <br />and controlled passage of a 100 year/ 24-hour storm event (Peak Discharge = +/- 96.2 cfs). Refer to Exhibit <br />Drawing E13 for construction details and specifications. <br />A storage volume of 0.566 acre-ft (184,430 gal.) is provided for containment below the weir to give sufficient <br />time for settling any sediment. <br />This catchment and settling basin will be constructed down gradient of the disposal cell to intercept and settle <br />sediment from surface water run-off in the event of such an occurrence. Leachate shall be collected and <br />returned by pumping to the impoundment and/or water storage above the mill. Impacts to surface water will be <br />controlled as per the stormwater management plan (Exhibit T) and design details can be found in the Tailings <br />Impoundment Design Drawings (Exhibit E). <br />• <br />Page 30 of 35
The URL can be used to link to this page
Your browser does not support the video tag.