My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-27_PERMIT FILE - M2009076 (9)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009076
>
2010-07-27_PERMIT FILE - M2009076 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:16:51 PM
Creation date
7/29/2010 12:06:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009076
IBM Index Class Name
Permit File
Doc Date
7/27/2010
Doc Name
Ex. E, Map E12, Leachate Collection Barrier
From
Venture Resources
To
DRMS
Email Name
ACS
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This design models existing grade conditions after successfully excavating footing down to solid bedrock. The footing <br />is cast directly onto bedrock, incorporating #8 rebar pins set on 2' centers into bedrock (see below). <br />#5 Gr 60 Rebar <br />12" OC Horz. <br />12 OC Vert. <br />#5 Gr 60 Rebar <br />12 OC Horz. <br />18" OC Vert. <br />22' <br />4' <br />2' <br />• <br />"Wet" Side <br />Ir #5 Gr 60 Rebar & #8 Gr 60 Rebar, 3' -4" Hook <br />12" OC Horz. 6" OC Vert. <br />3" Overflow to Sediment Pond <br />#5 Gr 60 Rebar <br />12 �� OC Horz. <br />18" OC Vert. <br />#8 Gr 60 Rebar x 4' <br />Drilled and Grouted 2' <br />into Solid Rock @ 2' OC <br />#5 Gr 60 Rebar <br />12" OC Horz. <br />6" OC Vert. <br />(sump omitted from view for clarity) <br />24 " 1.5" Leachate Recycle <br />8 11 (pump discharge) <br />6' -8' <br />3" Overflow <br />d 8' -0" <br />#5 Gr 60 Rebar <br />12" OC Horz. <br />12" OC Vert. <br />Step from 10" to 8" Thick Wall <br />#5 Gr 60 Rebar <br />12 �� OC Horz. #5 Gr 60 Rebar & #8 Gr 60 Rebar, 3' -4" Hook <br />6" OC Vert. 12" OC Horz. 6" OC Vert. <br />Backfill on "dry" <br />line <br />side (south) shall consist <br />of earth and rock excavated from "wet" side. Width of back fill at top <br />of wall shall <br />be a <br />minimum of 12' to allow <br />settling <br />for vehicle <br />of the <br />traffic. Sloped <br />side <br />of <br />backf <br />ll shall <br />W�� <br />be revegatated <br />to <br />prevent erosion. <br />The composite liner system shall be affixed to the continuous footing as per the liner submittal details in Exhibit C. <br />The leachate collection <br />line <br />shall be <br />connected to a sump connected to the GeoComposite Liner leachate drain, <br />to facilitate dewatering <br />and <br />settling <br />of the <br />deposited <br />tailings. <br />� rt <br />The leachate will be pumped back to the mill as recycled process water. <br />42189 <br />2 7 ,1 a <br />V <br />O POO <br />� <br />a c <br />MCI <br />� rt <br />W�� <br />c <br />�o <br />IZ <br />� <br />� <br />o <br />N <br />U <br />� <br />rt <br />Old <br />W <br />c:. <br />.. <br />J <br />G <br />O <br />0. <br />P6 <br />a� <br />a <br />V <br />O POO <br />El <br />Top of Structure <br />Datum 8,320.00' Elev. <br />10" <br />10" .. <br />(i <br />4" Leachate Collection, wet sump. <br />14' - 8 " <br />:' 1 1 ".e. 1.:: <br />Composite liner system installed <br />on top of continuous footing. <br />Refer to Exhibit C for liner <br />submittal details. <br />W�� <br />�o <br />N <br />� <br />� <br />WOO <br />N <br />U <br />� <br />ago <br />W <br />/ <br />P" <br />.. <br />O <br />P6 <br />a <br />El <br />Top of Structure <br />Datum 8,320.00' Elev. <br />10" <br />10" .. <br />(i <br />4" Leachate Collection, wet sump. <br />14' - 8 " <br />:' 1 1 ".e. 1.:: <br />Composite liner system installed <br />on top of continuous footing. <br />Refer to Exhibit C for liner <br />submittal details. <br />
The URL can be used to link to this page
Your browser does not support the video tag.