Laserfiche WebLink
Colorado Beef Fresh Water Reservoir <br />Apra 6, 2009 <br />Page S <br />P--mh Engh -A Mnsultm% lim <br />earthwork and foundation construction phases to help determine that the design require_rnents <br />are Indfilled. <br />This rep wn«F a be -M «p, ..a� fo r 1Ean, .snT..ni,e® nF Ti2 S re �ivsf� !''aftin 'P,* Ai„rr TT <br />ose as °se p a_ ad ffie, e x-o h- s - V2 u v_ Ja -s ' irez d�esmm ��tit3� : a:e , <br />and Enviro -dig Engineering for specific application to the project discussed and has been <br />prepared in accordance with generally accepted geotechnical engineering practices. No <br />wm= express or ltnp: °d, is made. In `dic event dw any ci ges I the :.aria de3iV71 041 <br />location of the project as outlined in this report are planned, the conclusions and <br />recot?ut?endations contained in this report shall not be considered valid unless the changes <br />are reviewed and the conclusions of this report are modified or verified in writing by t Le <br />geotechnical engineer. <br />We appreciate the opportunity to be of service to you on this projua. If you have any <br />Questions concerntinb this report, or ff — e„ h of fi4*ther service to — in any other <br />please do ii hesitate to contact us. <br />Very truly yours, <br />Earth Engineering Consultants, Inc. <br />w7 -I <br />Lester L. Litton, P.E. <br />Principal Engineer <br />Reviewed by; <br />LLLIEPWIdIa <br />Ethan P. Wicchert, P.E. <br />Senior Project Engineer <br />