remain within the work area. Excavated material shall be removed from work <br />site daily. <br />F. Refusal <br />1. Should the Contractor meet refusal during the jacking operation, the Contractor shall <br />determine the cause of the refusal and take additional measures required to proceed. <br />2. Hand mining may be performed to correct condition causing refusal. Conduct had <br />mining only in casings that are sufficiently large enough to permit personnel to <br />perform had mining. Provide adequate fresh air supply within the casing pipe and <br />conduct had mining in accordance with the requirements of the U.S. Department of <br />Labor, Safety and Health Regulations for Construction, promulgated under the <br />Occupational Safety and Health Act of 1970 (PL -91 -596) <br />3. Should it become impossible to proceed on the original alignment shown on the <br />Drawings, the Contractor shall notify the Engineer of the conditions, including the <br />cause of the refusal, and provide alternative solutions for the Engineer's evaluation. <br />Take only those actions required to protect people and property prior to approval of <br />selected alternative by the Engineer. <br />G. Carrier Pipe <br />Install carrier pipe as shown on the Drawings and per specification Section 331100 <br />H. Backfilling and Grading <br />1. Remove all boring and jacking equipment, tools and unused casing pipe from jacking <br />pit and receiving pit, or shaft <br />2. Backfill jacking pit and receiving pit, or shaft, as specified in Section 312333, <br />Trenching and Backfilling <br />END OF SECTION <br />330523.16 -6 <br />