My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-27_REVISION - M1977223 (13)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977223
>
2010-07-27_REVISION - M1977223 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:22:46 PM
Creation date
7/28/2010 11:36:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977223
IBM Index Class Name
REVISION
Doc Date
7/27/2010
Doc Name
Water System Improvements
From
JBS Five Rivers Cattle Feeding
To
DRMS
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.5 PROJECT/SITE CONDITIONS <br />A. Unanticipated Conditions <br />1. Notify the Owner or Engineer of unexpected subsurface conditions and discontinue <br />work in affected area until notified by Owner /Engineer to resume work <br />2. Take emergency measures as required to protect persons and improvements <br />B. Existing Conditions <br />I. The Contractor takes full responsibility for making him/herself of the conditions of <br />the site prior to construction <br />2. Restore the site to as good or better than original condition prior to construction <br />activities <br />V' f� i � / 1 :7 :7: \ 2 1 111 •/ <br />A. The contractor shall provide a warranty of construction as necessary per CDOT and /or <br />Owner requirements <br />PART 2 — PRODUCTS <br />2.1 MATERIALS <br />A. Casing pipe, spacers, carrier pipe and casing end seals see Section 331100 for details <br />B. Directional Boring System <br />I. Contractor shall provide a pneumatically or hydraulically operated fluid assisted <br />remote guided boring system capable of installing the pipe by trenchless methods per <br />Drawings without damage <br />2. Equipment shall be designed to provide accurate control of both line and the grade of <br />_,... the boring head <br />a. Provide pumps, compressors, tools and all equipment certified as suitable by the <br />system manufacturer to install the new pipe without stressing or damaging the <br />pipe <br />b. Provide a circulatory and recovery system that will recover the bentonite or other <br />drilling fluids <br />c. Provide supply of water for mixing drilling fluid <br />PART 3 - EXECUTION <br />3.1 PREPARATION <br />A. Protection <br />1. Provide necessary safety measures for construction activities <br />2. Implement the required traffic control and notification to CDOT by installing the <br />necessary barricades, warning signs, lights etc. <br />3. Identify required lines, levels, contours, and datum <br />4. Field verify the location and depth of all existing utilities, including service <br />330523.13 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.