My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-27_REVISION - M1977223 (13)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977223
>
2010-07-27_REVISION - M1977223 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:22:46 PM
Creation date
7/28/2010 11:36:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977223
IBM Index Class Name
REVISION
Doc Date
7/27/2010
Doc Name
Water System Improvements
From
JBS Five Rivers Cattle Feeding
To
DRMS
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v^ � <br />s <br />pastures) <br />b. All areas shall be left in a condition equal to or better than it existed before <br />construction <br />c. Compact all material from 12" above top of pipe to surface to a minimum of 90% <br />of maximum density, at -1 to +3 of optimum moisture content as determined by <br />ASTM D69 or density of adjacent, undisturbed areas; the greater of the two <br />d. May be installed in any method as long as there is no adverse affects, possibility <br />or future possibility of damaging the installed pipe <br />H. Compaction <br />1. Place and compact backfill material around pipes with care in order to avoid <br />damaging pipe <br />2. Take measures when compacting backfill around pipe that the pipe maintains position <br />within the trench <br />3. Compact fill materials to the required densities <br />4. Use equipment that is suitable for the compaction of all backfill material <br />5. Do not operate equipment in close proximity of trench that would cause instability of <br />soil and failure <br />6. All costs of compaction testing shall be at the contractors expense <br />I. Grading <br />1. Once complete with trench work and backfill material is settled, perform finish <br />grading in accordance with the completed contour elevations and grades shown and <br />blend into conformation with remaining natural ground surfaces <br />2. Leave all finished grading surfaces smooth and solid to drain <br />3. Bring finish grades to elevations within +/- 0.1 ft <br />4. Surplus excavated materials from all excavations shall be disposed of by the <br />Contractor at his expense <br />3.3 FIELD QUALITY CONTROL <br />A. Soil Compaction Tests <br />1. Conduct in accordance with requirements of ASTM D698 <br />2. Provide standard proctor tests for each type of embedment or backfill material <br />proposed <br />3. Use test results as a basis for compaction control] <br />4. Conduct density tests during compaction operations in accordance with ASTM <br />specifications <br />5. Conduct a minimum of one test for each layer of specified depth of backfill every <br />1,000 ft or less <br />3.4 SCHEDULES <br />A. Pipe Embedment <br />1. Class "A" <br />a. Not required unless pour trench conditions, verify with Engineer prior to use <br />2. Class "B" <br />[c IWAI oig]W <br />
The URL can be used to link to this page
Your browser does not support the video tag.