Laserfiche WebLink
CIRCES Cost Estimatinq Software <br />BULLDOZER WORK <br />::.::.::.::::.>......:::::::::::::::::::::::::::::::::::::::::::::::::::::.:......................................................... <br />PROJECT IDENTIFICATION <br />Task # : 004 State : Colorado Permit/job# : M1974-069 <br />Date <br />User <br />07/13/2010 <br />ECS <br />Agency or organization name : DRMS <br />Permit or other job action : Reclamation <br />Task description : Backfill Overburden Pit 20 <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9U (2005) <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 : NA <br />Shiftbasis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $58.16 NA <br /> Operating cost/hour : $101.59 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $198.29 Total fleet cost/hour : <br />xxx. $198.29 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 48,400 LCY factor : NA volume : 48,400 LCY <br /> <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 578.4 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,500 feet Material weight : 0.85 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,700 Ibs/LCY Net correction : 0.42 <br />Weight description : <br />Sand and clay - Loose Adjusted unit production : 245.28 LCY/hr <br /> Adjusted fleet production : 245.28 LCY/hr <br /> <br />:.;;:.::< .::::::::::::::::::::::::::::::::::::::::.:::::::::::::::::::::: <br />JOB TIME AND COST ::::............................................... ...................... <br />Fleet size : 1 Dozer(s) Total job time : 197.32 Hours <br />Unit cost : $0.808 /LCY Total job cost : $39,127 <br /> <br /> <br />County : Larimer <br />Site : Larimer Pit <br />Abbreviation :none <br />Filename :M069-004 <br />Horsepower: 405