Laserfiche WebLink
3 (Form 2- Public) <br />C. LOCATION MAP: Attach. a USGS 7.5 minute quad, or similar map of adequate scale, which locates the prospecting <br />site(s). <br />D. Are prospect sites (e.g., drill holes, trench locations, etc... ) staked on the ground" Yes X, No <br />E. Specify the Land Management Agency, Address and Telephone Number: <br />-F - <br />f <br />7-0 <br />F. The prospector is required to document that the NOI has been sent to the BLM or the USES. Processing of the NOI will <br />not begin until the prospector has submitted evidence acceptable to the Division that the NOI was sent to the BLM or <br />USES. Check one: <br />Evidence of notification is attached to this NOI for BLM Land <br />Evidence of notification is attached to this NOI for USFS Land. <br />_ Other proof of notice is attached to this NOI <br />If. MAPS & DRAWINGS <br />Accurate topographic base map showing the location of the proposed project must be submitted with this notice. The prospector <br />may submit a U.S.G.S. 7.5 minute quadrangle, or similar map of adequate scale that: <br />I. identifies the proposed prospecting site(s) or activity areas involving surface disturbance. Activity areas include all drill holes, <br />mud pits, excavations, trenches, adits, shafts, tunnels, rock dumps, stockpiles, impoundments and prospecting roads, and <br />2. includes sufficient detail to identify and locate known prospecting features and facilities that may be affected and those that <br />are not anticipated to be affected. This includes the location of all drill. holes, mud pits; excavations, trenches, adits, shafts, <br />tunnels, rock dumps, stockpiles, impoundments and prospecting roads. Color photographs, adequately labeled (including <br />date, orientation and location), of the prospecting site may be used to fulfill this requirement if included with the NOI <br />submittal. <br />III PROJECT DESCRIPTION <br />1. Mineral(s) andlor .Resource(s) being Investigated: > _'.. ...._,,,F; ; . _., % f m__ _....._.._....._.__._. <br />2. Estimated dates of commencement and completion: <br />Commencement: Al <br />Completion: %°?° <br />3. Amount of material to be extracted, moved or proposed to be moved: <br />4. Identify the type or method of prospecting proposed and quantity (place an "XII <br />X Cuts Pits Trenches <br />Shafts "t"unnels Adits Declines <br />____.Air Drilling Fluid Drilling „Drilling & Blasting,