My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-23_GENERAL DOCUMENTS - C1982056
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1982056
>
2010-07-23_GENERAL DOCUMENTS - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:16:42 PM
Creation date
7/23/2010 2:47:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/23/2010
Doc Name
Mining Permit (Dated 5/23/2008 to 5/23/2013)
Permit Index Doc Type
Permit Legal Document
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RIDER TO MINING PERMIT <br />Permit Date: May 23, 2008 <br />Permit No: C-1982-056 <br />The following additional stipulations form an integral part of the foregoing permit: <br />Stipulation No. <br />Description <br />64. Twentymile Coal Company is approved to construct the Refuse <br />Disposal Area Expansion in accordance with designs approved <br />in Technical Revision No. 67. Twentymile Coal Company has <br />requested to provide bond for the increased disturbance area in <br />three increments. The first increment, "Initial Bonded <br />Disturbance" of 50.0 acres, is limited to construction of 30.3 <br />acres refuse pile expansion, 2.4 acres haul road corridor, 5.9 <br />acres unclassified stockpile, 3.5 acres topsoil stockpile, 0.4 acres <br />stockpile haul corridors, and 7.5 acres construction of RDA10 <br />and RDAll ditches, as shown on Map C-102 (11/13/2009). <br />Prior to disturbance of the Refuse Disposal Area expansion <br />beyond the Initial Bonded Disturbance, Twentymile Coal <br />Company is required to submit additional bond adequate for <br />disturbances associated with bonding increments I, and II. No <br />disturbance associated with bonding increments I and II shall <br />occur prior to submittal and Division approval of additional <br />bond. <br />ACCEPTED AND AGREED: DIVISION OF RECLAMATION, MINING & SAFETY <br />COLORADO DEPARTMENT OF <br />NATURAL RESOURCES <br />By Gu-e-?t <br />ator Title Division Director <br />AG Alpha No. NR LR TYB <br />AG File No. PNR/3928/JD
The URL can be used to link to this page
Your browser does not support the video tag.