Laserfiche WebLink
0 <br />company. In some areas, such as "T" joints, extrusion welds were used to provid.! a complete <br />seal. Extrusion welds were also used at the inlet/outlet pipe boots. These welds were inspected <br />by TEC and found to be solid and continuous. <br />N <br />On TEC's final inspection of November 30, 1995, two locations were noted on tht: pond berm <br />where the liner had been ripped during liner anchor construction. While these rips are small and z <br />not located within the pond, TEC recommends that these be repaired, Ui <br />1 trust this submittal meets with your approval. If you should have any questions or concerns, U <br />please feel free to contact me at (303) 850-9852. Q <br />Respectfully, Q <br />Titan Environmental Corporation <br />F <br />John F. Lupo, P.E. <br />Project Manager <br />cc: Mitch Lapp - Henderson Mine <br />Aian Sorenson - Division of Minerals and Geology <br />Allen <br />-wIV-AKM- Fnvirain toentail