Laserfiche WebLink
4. No new surface land disturbances were conducted in the 2009/2010 anniversary <br />year; therefore previous map submittals remain current. During the 2009/2010 <br />anniversary year the following activities were conducted in reclaiming the site. <br />a. The Telluride head tank facility was dismantled and removed. Bedding <br />materials consisting of historic tailing materials and 70-1b railroad rail <br />were removed from beneath the tank. The railroad rail was collected and <br />sent out for recycling and the tailing materials were collected and placed <br />on the Telluride Tailing Pile #5 as advised and approved by the Colorado <br />Department of Public Health and Environment. <br />b. The Red Mountain Mill Warehouse collapsed during the 2009/2010 winter <br />season. The collapsed structure is being demolished and removed. These <br />activities will be completed prior to the end of the 2010 field season.