Laserfiche WebLink
I+ESaENp: <br /> EXISTING GROUND SURFACE CONTOUR AND 0. FEET <br />PROPOSED GROUND SURFACE CONTOUR 0. FEET <br /> \ <br /> <br />?gk <br />Xp ` <br />?? EXISTING UNIMPROVED ROAD/TRAILS <br />- -. <br /> p0 \ <br />? -. -. .. EXISTING IMPROVED ROADWAYS <br /> '0 OQ <br />+0 <br />Q EXISTING DRAINAGES <br />?.?fl <br />? O 0 L / <br />A <br />I -----_.? PREVIOUSLY DEPLOYED LINER <br />8 T O <br />/ ?i DEPLOYED LINER <br /> <br /> NOTES <br />252 SQUARE FEET OF 100 MIL GEOMEMBRANE DEPLOYED DURING WEEK <br />APPROXIMATELY 11 <br /> , <br />APPROXIMATELY 1,003.703 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />Op ` ? r <br /> <br /> <br /> <br />00 I <br />i7 t /0 <br /> <br /> <br />00+0`0 <br />O <br />O <br />k <br />N <br />r <br />O <br />N <br />W <br /> O <br /> <br /> <br />00 <br />X <br /> <br />?O <br /> O <br /> O <br /> w etmtr CRIPPLE CREEK & VICTOR <br />o GOLD MINING COMPANY <br />+ <br />co PROS PHASE 5 VLF <br />c? <br /> o Tm <br /> <br />00 PHASE 5 GEOMEMBRANE INSTALLATION <br /> w <br /> <br /> DESIONEO BY CYT CHECKED JON DATE <br /> OO <br />ameO <br /> <br />DRAWN BY <br /> <br />CWT <br /> <br />PROVED By <br />4 <br /> <br />JON <br /> <br />07/03/10 <br /> x EARTH AND ENVIRONMENTAL CARD mauNE ft Rn <br /> O 4 <br />l 0