My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-19_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-07-19_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
7/19/2010 2:29:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/19/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports: Weeks of 06/20/2010 and 06/27/10.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amecl* <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: July 3, 2010 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 6/27/10 through 7/3/10 <br />Days S M T W T F S <br />Work Shifts D D D D D D - <br /> E <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 48°F to 52°F (+/-) High: 75°F to 82°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Work activities were not performed Saturday (7/3/2010) in observance of the 4th of July holiday. <br />Low volume solution collection fill placement was only performed during night shift on Tuesday <br />(6/29/2010). <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Topsoil <br />1) Stripping <br />No work performed during the week. <br />B) Subgrade Preparation <br />1) VLF <br />Fine grading, moisture conditioning, and compaction of subgrade was performed prior to soil <br />liner fill (SLF) placement during the week. The areas inspected and approved for placement <br />are shown in Figure 2. <br />C) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas; between stations A36+00 (+/-) and <br />A41+50 (+/-), approximately 0 to 200 feet left of centerline; between stations C1+00 (+/-) and <br />C7+00 (+/-), approximately 50 to 100 feet left of centerline; between stations E20+00 (+/-) and <br />E22+50 (+/-), approximately 150 feet left of centerline to 150 feet right of centerline and <br />between stations H0+00 (+/-) and H10+00 (+/-), approximately 0 to 300 feet right of <br />VLF Weekly Report WE 07.03.10.1)
The URL can be used to link to this page
Your browser does not support the video tag.