Laserfiche WebLink
are 9, 16, the east quarter of 17 and the north half of 21. Several of the post-mining <br />drainages, however, are not duplicated on Maps 41 and 41 A. This has led to several <br />inconsistencies between the approved Map 41 and the proposed changes to the East and <br />West Taylor Fills, South Taylor Mine Plan and South Taylor post-mining topography (as <br />shown on Maps 19B, 23A and 41 A). The following are the inconsistencies between the <br />approved Map 41 and the changes proposed on Map 41A that need to be fixed. Since the <br />mining areas cross-over, the Division requests that all common drainages from Sections <br />9, 16, 17 and 21 are shown on both maps. Additionally, the Division recommends <br />making a notation following the ditches common to Maps 41 and 41 A to instruct the <br />viewer that these ditches are shown on both maps. <br />a. On the currently approved Map 41 the Taylor Tributary Ditch flows from the top <br />of the East Taylor Fill through the West Pit and into the East Taylor Pond. The <br />approved toe of the East Taylor Fill is at approximately station 87+00 of the <br />Taylor Tributary Ditch. The proposed toe of the East Taylor Fill will put it at <br />approximately station 80+00 of the Taylor Tributary Ditch. Additionally, the <br />proposed plan for the East Taylor Fill does not call for the Taylor Tributary Ditch <br />to flow down the middle of the East Taylor Fill. Rather, the East Taylor Fill will <br />drain into the East Taylor East Tributary Ditch and the East Taylor West <br />Tributary Ditch. There two ditches will then flow into the Taylor Tributary Ditch <br />(and ultimately into the East Taylor Pond). Please redesign the Taylor <br />Tributary Ditch to correct its length and location for the proposed toe of the <br />East Taylor Fill (Map 12 and Map 33A will also need to be updated with this <br />redesign). Please provide new SEDCAD modeling for the redesigned Taylor <br />Tributary Ditch. Please include the new fill design on Map 41 as well as the <br />portions of the East Taylor East Tributary Ditch and the East Taylor West <br />Tributary Ditch that appear on Map 41. Please include the portion of the <br />Taylor Tributary Ditch that appears on Map 41A. Please provide new <br />SEDCAD modeling for the East Taylor Pond to reflect the changes to the <br />Taylor Tributary Ditch, the East Taylor East Tributary Ditch, the East <br />Taylor West Tributary Ditch, the East Taylor Fill and the changes to the <br />post-mining topography on and around the East Taylor Fill. <br />b. The West Pit Ditch intercepts the Taylor Tributary Ditch at approximately station <br />78+00. This intercept location is just below where the East Taylor Fill will toe <br />out (at approximately station 80+00 of the Taylor Tributary Ditch). Please <br />review the location of the West Pit Ditch to ensure its location will not be <br />affected by the proposed toe of the East Taylor Fill. Please add the West Pit <br />Ditch to Map 41A. <br />c. Map 41 shows the Section 16 Taylor Ditch (Version 2). This ditch is located in <br />the southwest corner of the map and is above (topographically) the East Taylor <br />Fill. The approved design of the ditch appears to have it draining into an area <br />above the fill and, ultimately, into the Taylor Tributary Ditch. This ditch is not <br />shown on Map 41 A. As discussed in "a" above, the proposed design for the East <br />Taylor Fill has the runoff flowing into the East Taylor East Tributary Ditch and <br />the East Taylor West Tributary Ditch and, ultimately, into the Taylor Tributary <br />Ditch. Based on the proposed plan it appears that the Section 16 Taylor Ditch