My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-16_REVISION - C1981020
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981020
>
2010-07-16_REVISION - C1981020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:16:21 PM
Creation date
7/16/2010 12:59:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Revision
Doc Date
7/16/2010
Doc Name
Cost Estimate
From
Jim Stark
To
Mike Boulay
Type & Sequence
MT6
Email Name
JRS
SB1
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Team Work cont'd Task # : 005 sheet 2 of 2 <br />Loading Tool Cycle Time : Number of loading tool passes required to fill truck : 3 passes <br />Excavators and front shovels -machine cycle time vs. job condition rating : AVERAGE <br />-selected value within basic rating : AVERAGE <br />Track loaders - material descr.: NA <br />- cycle time elements (min.) : Load : NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders - unadjusted basic loader cycle time ( load, maneuver, and duml NA minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : NA NA NA <br />Stockpile : NA NA NA <br />Truck ownership : NA NA NA <br />Operation : NA NA NA <br />Dump target : NA NA NA <br /> Net cycle time adjustment : IVAv minutes <br /> Adjusted loader cycle time (total time per loader pass) : 0.321 minutes <br /> Net load time per truck * : 0.742 minutes <br />Truck Cycle Time : *bulk of 1st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />Truck exchange time **: 0.50 minutes........ Adjusted for site altitude : 0.500 minutes <br />Truck load time: 0.742 minutes........ Adjusted for site altitude : 0.742 minutes <br />Truck maneuver and dump time: 0.80 minutes........ Adjusted for site altitude : 0.800 minutes <br />-set at 0 if exchange time < adj. loader cycle time (truck exchange completed during 1st loader cycle) <br />Truck travel (haul & return) time: Road condition :Firm, smooth, rolling, dir0t. surfaced, watered, maintained <br />Hnid rniita <br />Road <br />segment # Haul distance Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed Travel time <br />(minutes) <br />1 8,730 10.00 3.00 13.00 834 10.476 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time ** : 10.476 minutes <br />minutes <br />minutes <br />Loading tool unit production : 380.43 LCY/hour...... Adjusted for job efficiency : 315.76 LCY/hour <br />Truck unit production : 30.33 LCY/hour...... Adjusted for job efficiency : 25.17 LCY/hour <br />Optimal no. trucks/loading tool : 13 trucks........... Selected no. trucks/loader : 4 trucks <br /> Adjusted hourly truck team production : 100.68 LCY/hr <br /> Adjusted hourly single truck/loader team production : 100.68 LCY/hr <br /> Adjusted hourly multiple truck/loader team production : 100.68 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 17.81 Hours <br />Unit cost : $3.656 /LCY Total job cost : $6,555 <br />travel time shown for each segment includes acceleration/deceleration adjustment Return time`: 3.063 <br />"total haul and return time shown includes altitude adjustment Total truck cycle time : 15.581
The URL can be used to link to this page
Your browser does not support the video tag.