Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task # : 042 State : Colorado Permit/job #: C-1981-020 <br />Date : 0711612010 County :Garfield Abbreviation :none <br />User : JRS Site: Munger Canyon Mine Filename C020-042 <br />Permit or other job action :2010 Midterm Review (Mt-06) <br />Task description : Mobilize/Demobilize Equipment for Remaining Reclamation <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />1JnN_RnAnAR1 F F(3111PMFNT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series 11 - 8SU (20 52.55 $46.56 $125.45 1 $172.01 $125.45 $250.00 <br />-Cat 330C L 37.18 $45.38 $117.55 1 $162.93 $117.55 $250.00 <br />-GENERIC 3.0 in. - 500 ft. c 6.25 $17.93 $88.67 1 $106.60 $88.67 $250.00 <br />-Reveg Equipment 20.00 $78.00 $88.67 1 $166.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $608.21 $420.34 $750.00 <br />sheet 1 of 2