My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-16_REVISION - C1981020
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981020
>
2010-07-16_REVISION - C1981020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:16:21 PM
Creation date
7/16/2010 12:59:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Revision
Doc Date
7/16/2010
Doc Name
Cost Estimate
From
Jim Stark
To
Mike Boulay
Type & Sequence
MT6
Email Name
JRS
SB1
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 035 State :Colorado Permit/job# C-1981-020 <br />Date : 0711612010 County: Garfield Abbreviation : none <br />User : JRS Site :Munger Canyon Mine Filename :C020-035 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2010 Midterm Review (MT-06) <br />Task description : Regrade Haul Road <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200,1 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:3-shank ripper <br />Horsepower: 310 <br />Shiftbasis : 1 per day <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $53.74 NA <br /> Operating cost/hour : $70.63 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $162.90 Total fl eet cost/hour : $162.90 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 926 CCY factor : 1.165 volume : 1,079 LCY <br /> <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 491.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted till or embankment Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 0.97 (Cat HB) <br />Average push gradient : 2.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,600 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2900 lbs/LCY Net correction : 0.34 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 169.46 LCY/hr <br /> Adjusted fleet production : 169.46 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 6.37 Hours <br />Unit cost : $0.961 /LCY Total job cost : $1,037 <br />
The URL can be used to link to this page
Your browser does not support the video tag.