My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-16_REVISION - C1981020
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981020
>
2010-07-16_REVISION - C1981020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:16:21 PM
Creation date
7/16/2010 12:59:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Revision
Doc Date
7/16/2010
Doc Name
Cost Estimate
From
Jim Stark
To
Mike Boulay
Type & Sequence
MT6
Email Name
JRS
SB1
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: Colorado Division Of Reclamation, Mining And Safety <br />Task 034 State : Colorado Permit/job #: C-1981-020 <br />Date : 0711612010 County : Garfield Abbreviation :none <br />User : JRS Site : Munger Canyon Mine Filename : C020-034 <br />Permit or other job action :2010 Midterm Review (MT-06) <br />Task description : Replace Topsoil from Stockpile to Refuse Pile <br />HOURLY EQUIPMENT COST <br />Equipment Descriptio <br />Truck/loader team -Truck : Generic 8-10 cy, 6x4 <br />-Loader : Cat 330C L <br />Support equipment -Load area :INA <br />-Dump area :NA <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 excavate NA NA NA NA <br />% Utilization-machine : 100 94 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour : $10.10 $45.38 NA NA NA NA <br />Operating cost/hour : $31.23 $50.48 NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $22.29 $38.72 NA NA NA NA <br />Unit subtotals : $63.61 $134.58 NA NA NA NA <br />Number of units : 3 1 0 0 0 0 <br />Group subtotals : Work : $325.42 Support: $0.00 Maintenance : $0.00 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 1,390 CCY <br />Shift basis : 1 per day <br />Total work team cost/hour : $325.42 <br />Swell Loose <br />factor : 1.125 volume : 1.564 <br />LCY <br />Source of quantity take-off :Operator Estimate; Technical Revision 22 <br />Source of estimated swell factor : CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2,550 pounds/LCY Struck volume : 8.00 <br />Descr.:Earth - Dry packed Heaped volume : 10.00 <br />Rated payload : 27,280 pounds Average volume : 9.00 <br />Payload capacity: 10.70 LCY Adjusted volume`: 10.00 <br /> Final truck volume based on number of loader passes : 8.33 <br /> ' truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) <br />Rated capacity (nom. heaped) : 3.000 LCY Truck Loader <br />Descr.:Loose material - 118" to 318" (90 - 95YQ Altitude adj.: 1.000 1.000 <br />Bucket fill factor : 0.925 Job efficiency : 0.830 0.830 <br />Adjusted bucket capacity: 2.775 LCY Net correction : 0.830 0.830 <br /> <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />5,600 <br />Source
The URL can be used to link to this page
Your browser does not support the video tag.