Laserfiche WebLink
Munger Canyon Mine C-1981-020 <br />9()10 Miritarm Rcuinut (KAT-nR) <br />PROJECT IDENTIFICATION <br />Date : 16 July 2010 Permit: C-1981-020 Site: Munger Canyon Mine <br />User- := State : Colorado <br /> Filename: C020-000 County: Garfield <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: 2010 Midterm Review (MT-06) <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />001 Pull Road Fill Material to Base of Cut-Slope Released SL-01 0.00 $0 <br />002 Regrade Mine Road and Bench with Material from Task 001 Partial Release SL-01 38.62 $6,291 <br />003 Grade Munger Creek Crossing and Haul Material to Mine Released SL-01 0.00 $0 <br />004 Grade Drainages on Lower Road and Haul Road to Mine Released SL-01 0.00 $0 <br />005 Excavate Topsoil and Haul to Mine 17.81 $6,555 <br />007 Rip Backfilled and Rough Graded Areas Released SL-01 0.00 $0 <br />008 Final Grade All Disturbed Areas (<10%) Released SL-01 0.00 $0 <br />010 Seal and Plug Portals Released SL-01 0.00 $0 <br />Oil Seal All Monitoring Wells 14.00 $1,876 <br />012 Demolish and Remove All Structures Released SL-01 0.00 $0 <br />013 Reseed Mine Areas with Big Sagebrush Shrubland Seed Mix 2.92 $2,756 <br />014 Reseed Mine Areas with Big Sagebrush Shrubland Seed Mix 14.74 $13,914 <br />016 Place Material Hauled from Loma Loadout at Base of Mine Released SL-01 0.00 $0 <br />018 Rip Backfilled and Graded Areas of Loma Loadout Released SL-01 0.00 $0 <br />019 Final Grade All Disturbed Areas Released SL-01 0.00 $0 <br />020 Reseed Loma Loadout 5.96 $3,871 <br />023 Stream Channel Erosion Protection Released SL-01 0.00 $0 <br />031 Spread Uncompacted Refuse Released SL-01 0.00 $0 <br />032 Compact Uncompacted Refuse Released SL-01 0.00 $0 <br />033 Place Cover on Refuse Pile Released SL-01 0.00 $0 <br />034 Replace Topsoil from Stockpile to Refuse Pile 4.98 $1,622 <br />035 Regrade Haul Road 6.37 $1,037 <br />036 Regrade Refuse Pile Pond 3.87 $630 <br />037 Reseed Refuse Pile, Haul Road and Pond 9.80 $9,251 <br />042 Mobilize/Demobilize Equipment for Remaining Reclamation 6.00 $5,455 <br /> <br /> <br /> <br /> Direct Cost Total 125.07 $53,258 <br />jrs Page 1 16-07-10