Laserfiche WebLink
July 13, 2010 C-1980-007/West Elk Mine Ty, <br /> Photo 6—Construction of stacktube ST-5 at location of recently removed pond MB-2R at <br /> western toe of Lower Refuse Pile(in background) Strips of straw mat on slope of Lower Refuse <br /> Pile cover topsoil next to corridor for elevated product conveyors P3 and P5 that are not yet <br /> constructed. <br /> Number of Partial Inspection this Fiscal Year: 0 <br /> Number of Complete Inspections this Fiscal Yew: 1 <br /> Page 9 of 10 <br />