Laserfiche WebLink
Gorham, Kent <br />From: Trujillo, Al <br />Sent: Thursday, May 27, 2010 9:49 AM <br />To: Gorham, Kent <br />Cc: Velarde, Bill <br />Subject: RE: New Elk Coal Company exploration <br />Hi Kent, <br />I've been trying to have Ron Thompson call me back so that I could give him the bad news. DOW will likely be <br />okay with 3/5 bore hole locations, but approval of the two which require new road construction are likely to <br />be denied (we're okay with the cores, not okay with new roads). <br />The big hurry is that we explained the timing limitations placed on the CBM developer and our wish to remain <br />consistent with the season dates on all new construction on the SWA. Our contract with the gas company <br />applies only to them and not NECC; however, the dates are set for all new construction and NECC would like to <br />have the core holes completed before Sept. 1St. <br />I'll be in touch with you after I visit with Ron @ NECC...and see how they want to proceed. <br />Al Trujillo <br />Southeast Region Energy Coordinator <br />Colorado Division of Wildlife <br />4255 Sinton Road <br />Colorado Springs, CO 80907 <br />Office: (719) 227-5232 <br />Cell: (719) 250-2244 <br />From: Gorham, Kent <br />Sent: Wednesday, May 26, 2010 3:38 PM <br />To: Velarde, Bill <br />Cc: Trujillo, Al <br />Subject: New Elk Coal Company exploration <br />NECC has filed an application to drill 12 exploration boreholes in and around the New Elk mine area. About half of the <br />12 locations are on the BdO. <br />Only a couple of them require that roads be constructed. However, one of them is located on a side ridge in the right <br />fork of Apache Canyon. On the map they provided, I don't see any easy way to build a road to this location. If you <br />know, what, if any, restrictions were placed on New Elk in their lease with the DOW regarding surface activities? Does <br />the DOW want to have input regarding the position and placement of any temporary roads? Currently, I do not see a <br />way that this hole can be moved to existing roads due to the relatively few roads in this area of the BdO.