My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-15_REVISION - C1981041 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2010-07-15_REVISION - C1981041 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:16:13 PM
Creation date
7/15/2010 12:33:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
7/15/2010
Doc Name
2010 Midterm Cost Estimate
From
Jim Stark
To
Mike Boulay
Type & Sequence
MT6
Email Name
JRS
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : 14-Jul-10 Permit C-1981-041 Site: Roadside Porta ls <br />User: JRS State : Colorado <br /> Filename: C022-OOg County: Mesa <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: 2010 Midterm Review (MT-06) <br /> Topsoil Replacement Tasks - Tasks 099-110 and 112 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />099 Move Topsoil from Borrow Area to Roadside Areas 22.35 $19,328 <br />100 Replace Topsoil at Borrow Area 1.64 $1,418 <br />101 Replace Topsoil from Stockpile to South Fan 0.54 $468 <br />102 Replace Topsoil from Stockpile to Overland Conveyor Area Partial Release SL-05 3.02 $2,615 <br />103 Replace Topsoil from Stockpile to Railroad Spur Area Partial Release SL-05 2.43 $2,102 <br />104 Replace Topsoil from Stockpile 1 to North Portal Area 13.24 $11,454 <br />105 Replace Topsoil from Stockpile 3 to North Portal Area 4.54 $3,923 <br />106 Replace Topsoil from Stockpile to TR-33 Drill Pad Slot 0.74 $464 <br />107 Replace Topsoil from Stockpile 2 to CRDA #1 30.75 $26,599 <br />108 Replace Topsoil from Stockpile 2 to CRDA #2 44.84 $38,783 <br />109 Strip Topsoil at CBA-2 4.80 $4,155 <br />110 Replace Topsoil from Stockpile to CBA-2 4.80 $4,155 <br />112 Replace Topsoil from Stockpile to CBA-1 2.56 $2,211 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Total Direct Cost 136.25 $117,675 <br />jrs page 7 of 14 14-07-10
The URL can be used to link to this page
Your browser does not support the video tag.