Laserfiche WebLink
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />CIRCES Cost Estimatina Software <br />SCRAPER TEAM WORK <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 005 State :Colorado Permit/job #: C-1981-041 <br />Date : 0711412010 County :Mesa Abbreviation :none <br />User: JRS Site: Roadside Portals Filename :C041-005 <br />Permit or other job action :2010 Midterm Review (Mt-06) <br />Task description : Backfill and Regrade Railroad Spur Area <br />HOURLY EQUIPMENT COST <br />ipment Description <br />Cost Bre <br />Shift basis : 1 per day <br />Scraper work team -Scraper :Cat 623G <br />-Push dozer :NA <br />Support equipment -Load area : NA <br />-Dump area :NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $74.88 NA NA NA NA NA <br />Operating cost/hour : $102.63 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $38.72 NA NA NA NA NA <br />Unit subtotals : $216.24 NA NA NA NA NA <br />Number of units : 4 0 0 0 0 0 <br />Group subtotals : Work : $864.94 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : <br />Swell Loose <br />factor : 1.165 volume : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 6,395 CCY <br />Source of quantity take-off :1986 Division Estimate <br />Source of estimated swell factor : CAT Handbook <br />$864.94 <br />7,450 LCY