My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-15_REVISION - C1981041 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2010-07-15_REVISION - C1981041 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:16:13 PM
Creation date
7/15/2010 12:33:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
7/15/2010
Doc Name
2010 Midterm Cost Estimate
From
Jim Stark
To
Mike Boulay
Type & Sequence
MT6
Email Name
JRS
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roadside Portals C-1981-041 <br />9010 Midterm Review (MT-OR) <br />PROJECT IDENTIFICATION <br />Date : 15-Jul-10 Permit C-1981-041 Site: Roadside Portals <br />User: JRS State : Colorado <br /> Filename: C041-000 County: Mesa <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: 2010 Midterm Review (MT-06) <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />00a Backfilling and Rough Grading Tasks - Tasks 001-009 179.09 $144,646 <br />00b Cover Placement Tasks - Tasks 019-021 47.18 $40,803 <br />00C Ripping Tasks - Tasks 035 and 038-039 11.03 $7,236 <br />00d Road Reclamation Tasks - Tasks 045 and 050-051 1.83 $1,141 <br />00e Finish Grading Task - Task 059 53.81 $7,161 <br />00f Drainage Control System Installation and Removal Tasks - Tasks 069-079 and 092-093 143.14 $50,998 <br />Dog Topsoil Replacement Tasks - Tasks 099-110 and 112 136.25 $117,675 <br />00h Mine and Borehole Sealing Tasks - Tasks 120-121 42.00 $13,101 <br />00i Revegetation Tasks - Tasks 130-132 454.00 $551,738 <br />00j Structural Demolition Tasks - Tasks 135 and 139 275.00 $284,222 <br />00k Construction and Miscellaneous Tasks - Tasks 154-156 400.00 $29,256 <br />001 Equipment Mobilization and Demobilization Tasks - Tasks 160-162 22.22 $30,834 <br />00m Tasks Associated with Technical Revision - Tasks 170-175 77.35 $74,421 <br />00n Tasks Associated with Minor Revision - Tasks 180-182 19.29 $5,018 <br /> <br /> Direct Cost Total 1,862.19 1,358,250.00 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (2.02% of Direct Costs) $27,437 <br /> Performance Bond (1.05% of Direct Costs) $14,262 <br /> Job Superintendent (at $52.10/hour) 931.10 $48,510 <br /> Profit (10.00% of Direct Costs) $135,825 <br /> <br /> <br /> Total Overhead and Profit $226,033 <br /> <br /> Contract Amount Direct Costs + Overhead and Profit $1,584,283 <br />jrs Page 1 15-07-10
The URL can be used to link to this page
Your browser does not support the video tag.