Laserfiche WebLink
i <br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-1.12 <br />June 2010 Monthly Report <br />Page 3 <br />Table 2 -June 2010 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br /> of <br />l <br />V <br />Piezometer Date Depth to Water <br />(feet) Total Depth (ft) o <br />ume <br />Water (ft) <br />P12 6/30/10 41.68 41.71 0.03 <br /> 40 <br />0 <br />P13 6/30/10 40.94 41.34 . <br />P14 6/30/10 Dry 41.24 0.00 <br />P15 6/30/1.0 knii 41.10 0.00 <br />Table 3 below provides the calendar year 2010 sludge management for the San Luis site. <br />Table 3 - Water Treatment Plant Sludge Management Year to Date. <br />Date Quantity Sludge Management <br />February 2010 117 tons Transferred sludge from drying pad to <br /> tailings impoundment. <br />June 2010 Transferred sludge from Pond #3 to drying <br /> ad. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0798 or Mr. Bill Lyle (303) 324-2630. <br />ere4y, <br />A <br />J io F. Madrid <br />E vironmental Coordinator III <br />Cc: Bill Lyle <br />File