Laserfiche WebLink
<br />45 <br />40 <br />35 <br />30 <br />25 <br />v <br />= 20 <br />15 <br />10 <br />5 <br />0 <br />0 <br />NOTE: Derived based on <br />drawdown/pumping capability <br />as per contractor. <br />10 20 30 <br />Time (hr) <br />40 50 <br />Mine Pit Rapid <br />Drawdown <br />Hydrograph <br />CGRS <br />DURHAM PIT SLOPE STABILITY EVALUATION <br />CTL I T PROJECT NO. FC03746-125 <br />FIGURE 6 j