Laserfiche WebLink
-4- <br />12. Primarv future (Post-mining) land use (check one): <br />_ Cmpland(CR) -J._J Pastureland(PL) <br />Rangeland(RL) -E]Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Rcsources(WR) <br />13. Primarv present land use (check one): <br />Cropland(CR) Pasturcland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residcntial(RS) 1] Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife 1-fabitat(WL) <br />Industrial/Commercial(IC) <br />n Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Ilabitat(WL) <br />f!_J Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovcl): <br />Surface extraction and processing of aggregate using heavy equipment such as dozers, front-end loaders, scrapers, haul trucks, etc. <br />15. On Site Processing: _0 Crushing/Screcning <br />13,1 Briefly explain mining method (e.g. truck/shovel): <br />Materials are extracted and removed to screens and crushers for processing into product to be sold for urban infrastructure needs. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />None. All fuels and lubricants will be brought to the location as needed on mobile equipment and vehicles. <br />16. Description of Amendment or Conversion: <br />If you arc amending or converting an existing operation, provide a brief narrative describing the proposed change(s).