Laserfiche WebLink
• <br />• <br />Seneca Coal Company <br />Seneca II-W Mine <br />SL-3 - Phase I Bond Release Request <br />III. IDENTIFICATION OF LANDS <br />July 2010 <br />The Seneca II-W Mine is located approximately seven (7) miles south of the Town of Hayden, <br />Colorado off of Routt County Road 53. The USGS 7.5 Minute Quadrangle Maps of Hayden <br />Gulch, Hayden, Dunckley, and Mt. Harris, contain the described permit area. The permitted <br />area, including the mine area and the Tie-Across Haul Road, which connects Routt County Road <br />53 with the Hayden Station Power Plant, is approximately 4,093 acres. The permitted disturbed <br />area contains 1,381.9 acres of which 1,285.3 acres are within the mine area and the remaining <br />96.6 acres are associated with the Tie-Across Haul Road corridor. Surface ownership is <br />predominately private, with right of entry based on a variety of private leases, subleases and <br />easements. The permit area also includes limited areas of federal and state controlled surface. <br />The specific areas to which this bond release request applies are included within the Permit Area <br />described as follows: <br />TSN, R88W (Mine Area) <br />Section 9: Portions of SE'/NE`/, NE'/SE'/, and W%2NE'/ <br />Section 10: S``/2SY2NW`/o, SW`/, SE'/, Portions of S'/2NE`/ <br />Section 11: Portions of S''/2S%2SW'/ <br />Section 14: Portions of SW'/, NW'/, and S'/zSV2SE'/ <br />Section 15: All <br />Section 16: Portions of W%2NW'/, SE'/4NW`/, NE'/SW'/, and SE`/ <br />Section 21: Portions of E''/2NE'/a <br />Section 22: NW'/, NEV,, N%2SE'/o , SW'/SE!/4, Portions ofN'Y2SW'/o, and <br /> SW'/SE'/ <br />Section 23: NW'/, SW'/<, W'/2E%2, and W%2E%2E%2 <br />Section 26: W%2, W%2E'/2, and Portions of W%2E%2NE'/ and W'/2E'V2SE'/ <br />Section 27: E'/z <br />Section 34: NE'/<, N'hSE'/, and Portions of N'/2S%2SE'/ <br />Section 35: NW'/, W'i2NE'i4, W2SW`/ and Portions of N'V2S'i2SW`/, <br />NW`/aSE`/, NW'/4SW'/SE'/a, NW`/NE'/SE'/a, and W'/2E%2NE'/ <br />T6N, R88W (Tie Across Haul Road) <br />Section 14: Portions of SE'/, SW`/ <br />Section 23: Portions of N'/2 <br />Section 24: Portions of NE'/o, NW`/ <br />T6N, R87W (Tie Across Haul Road) <br />Section 17: Portions of SW'/, SE'/, NE'/ <br />Section 18: Portions of SE'/ <br />Section 19: Portions of N'/2 <br /> <br />All west of the 6th Principal Meridian; totaling approximately 4,093.0 acres. <br />The exact location of the bond release area is shown on Exhibit A - SL-3 Phase I Bond Request <br />Areas. <br />SL-3 -2