<br />•
<br />Seneca Coal Company
<br />Seneca II-W Mine
<br />SL-3 - Phase I Bond Release Request
<br />III. IDENTIFICATION OF LANDS
<br />July 2010
<br />The Seneca II-W Mine is located approximately seven (7) miles south of the Town of Hayden,
<br />Colorado off of Routt County Road 53. The USGS 7.5 Minute Quadrangle Maps of Hayden
<br />Gulch, Hayden, Dunckley, and Mt. Harris, contain the described permit area. The permitted
<br />area, including the mine area and the Tie-Across Haul Road, which connects Routt County Road
<br />53 with the Hayden Station Power Plant, is approximately 4,093 acres. The permitted disturbed
<br />area contains 1,381.9 acres of which 1,285.3 acres are within the mine area and the remaining
<br />96.6 acres are associated with the Tie-Across Haul Road corridor. Surface ownership is
<br />predominately private, with right of entry based on a variety of private leases, subleases and
<br />easements. The permit area also includes limited areas of federal and state controlled surface.
<br />The specific areas to which this bond release request applies are included within the Permit Area
<br />described as follows:
<br />TSN, R88W (Mine Area)
<br />Section 9: Portions of SE'/NE`/, NE'/SE'/, and W%2NE'/
<br />Section 10: S``/2SY2NW`/o, SW`/, SE'/, Portions of S'/2NE`/
<br />Section 11: Portions of S''/2S%2SW'/
<br />Section 14: Portions of SW'/, NW'/, and S'/zSV2SE'/
<br />Section 15: All
<br />Section 16: Portions of W%2NW'/, SE'/4NW`/, NE'/SW'/, and SE`/
<br />Section 21: Portions of E''/2NE'/a
<br />Section 22: NW'/, NEV,, N%2SE'/o , SW'/SE!/4, Portions ofN'Y2SW'/o, and
<br /> SW'/SE'/
<br />Section 23: NW'/, SW'/<, W'/2E%2, and W%2E%2E%2
<br />Section 26: W%2, W%2E'/2, and Portions of W%2E%2NE'/ and W'/2E'V2SE'/
<br />Section 27: E'/z
<br />Section 34: NE'/<, N'hSE'/, and Portions of N'/2S%2SE'/
<br />Section 35: NW'/, W'i2NE'i4, W2SW`/ and Portions of N'V2S'i2SW`/,
<br />NW`/aSE`/, NW'/4SW'/SE'/a, NW`/NE'/SE'/a, and W'/2E%2NE'/
<br />T6N, R88W (Tie Across Haul Road)
<br />Section 14: Portions of SE'/, SW`/
<br />Section 23: Portions of N'/2
<br />Section 24: Portions of NE'/o, NW`/
<br />T6N, R87W (Tie Across Haul Road)
<br />Section 17: Portions of SW'/, SE'/, NE'/
<br />Section 18: Portions of SE'/
<br />Section 19: Portions of N'/2
<br />
<br />All west of the 6th Principal Meridian; totaling approximately 4,093.0 acres.
<br />The exact location of the bond release area is shown on Exhibit A - SL-3 Phase I Bond Request
<br />Areas.
<br />SL-3 -2
|