Laserfiche WebLink
TABLE 2 - CONTINUED <br /> AREA DETAIL DISTURBE D AREA CURRENT STATUS <br /> ACRESN EAR <br />Well Field 12-inch diameter main Retained by American Soda. <br />Piping and header pipe rack, 8-inch See Well Field Status Map for <br />Pump lateral pipelines, and 4-inch detail of piping that remains in <br /> individual well pipelines. place. Pumping stations <br />Stations 'Two pumping stations. 8 <br />8 2000 remain in place with no <br /> . reclamation. Some areas <br /> where piping has been <br /> removed have been <br /> reclaimed. <br />Well Field Road extending from Main Retained by American Soda. <br />Roads Access road down to Test See Well Field Map for detail <br /> Mine bench and ponds and 8.0 2000 of roads that remain in place. <br /> roads accessing each well Some well field roads have <br /> ad in the well field been reclaimed. <br />Test Mine Process building and control Retained by American Soda. <br />Facility and room building on bench with Well skids and piping <br />Ponds (see supply well 20-8. Two lined removed from P&A wells are <br /> process water ponds. staged on this pad along with <br />photo 11) boilers removed from <br /> processing plant. Ponds <br /> 13 1997 reclaimed initially in 2006. <br /> Drill seeded area in 2007. <br /> Pond area is 8 acres. Test <br /> Mine Pad and road (5 acres) <br /> is still in use. <br />American Soda, L.L.P. <br />DRMS Annual Report <br />July 8, 2010