My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-09_HYDROLOGY - M1977344
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977344
>
2010-07-09_HYDROLOGY - M1977344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:15:19 PM
Creation date
7/13/2010 8:10:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
HYDROLOGY
Doc Date
7/9/2010
Doc Name
Proposed Groundwater Monitoring Plan
From
Holcim
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Portland Plant Holcim (US) Inc. <br />3500 Highway 120 <br />H o l c•m Florence, CO 81226 <br />July 7, 2010 <br />Phone 719 784 6325 <br />Fax 719 784 3470 <br />www.hoicim.com/us <br />Mr. Berhan Keffelew <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 719 <br />Denver, CO 80203 <br />t? <br />Re: Proposed Groundwater Monitoring Plan, DRMS Permit M-1977-344 <br />Dear Mr. Keffelew, <br />low <br />900 <br />The purpose of this groundwater monitoring plan (GMP) is to fulfill the requirements of <br />Technical Revision #6 (TR-06) to the Division of Mining, Reclamation and Safety Permit M- <br />1977-344. This permit is for the Holcim (US) Portland Plant quarry located adjacent to the <br />cement plant in Florence, Colorado. The quarry is located on the north side of the Arkansas <br />River. Groundwater in the area flows in a generally southerly direction toward the river. <br />Holcim proposes annual sampling of the following monitoring wells: <br />• MW-12 - Background well located in the north end of the quarry. <br />• MW-7 - Compliance well located in the southwest area of the quarry (approximately' <br />mile inside the quarry main entrance). <br />• MW-13 - Compliance well located in the southeast area of the quarry, approximately 100 <br />feet north west of the intersection of State Highway 120 and Bear Creek (approximately <br />'/ mile east of the main quarry entrance). <br />In addition, Holcim will continue monitoring water level in wells P-2, P-3, MW-9, and MW-11. <br />Holcim proposes monitoring for the following parameters: <br />• Total Dissolved Solids (TDS) <br />• Sulfate (S04) <br />• Potassium (K) <br />• Sodium (Na) <br />• Iron (Fe) <br />• Manganese (Mn) <br />In addition, the following field parameters will be recorded. <br />• pH <br />• specific conductance <br />• temperature
The URL can be used to link to this page
Your browser does not support the video tag.