Laserfiche WebLink
-2- <br />10. Primary Mine Entrance Location (report in either Latitude/Longitude OR UTM): <br />Latitude/Longitude: <br />Example: (N) 39° 44' 12.98" <br />(W) 104° 59' 3.87" <br />Latitude (N): deg -19 min n 9 sec? a-.95_ (2 decimal places) <br />Longitude (W): deg 10 3' min 2 0 sec 15 .0 7 (2 decimal places) <br />OR <br />Example: (N) 39.73691° <br />(W) -104.98449° <br />Latitude (N) (5 decimal places) <br />Longitude(W) (5 decimal places) <br />OR <br />Universal Tranverse Mercator (UTM) <br />Example: 201336.3 E NAD27 Zone 13 <br />4398351.2 N <br />Nad 83 <br />UTM Datum (specify NAD27, NAD83 or WGS 84) <br />Easting <br />Northing <br />11. Primary Future (Post-mining) Land Use (check only one): <br />Zone <br />12 <br />Cropland(CR) 30 Pastureland(PL) General Agriculture(GA) <br />El Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) El Industrial/Commercial(IC) <br />El Developed Water Re sources(WR) El Solid Waste Disposal(WD) <br />12. Primary Present Land Use (check only one): <br />0 Cropland(CR) Pastureland(PL) El General Agriculture(GA) <br />r7 Rangeland(RL) Forestry(FR) El Wildlife Habitat(WL) <br />El Residential(RS) Recreation(RC) IndustrialICommercial(IC) <br />El Developed Water Resources(WR) El Mining(MN) <br />13. Estimated Beginning Date of Contract: July 1 , 2010 <br />13.1 Estimated completion date of contract: Sept J., 2 01 0