Laserfiche WebLink
PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />Task # : 21B State :Colorado <br />Date : 0710612010 County :Gunnison <br />User : TAK Site : West Elk Mine <br />Agency or organization name: CDRMS <br />Permit or other job action : TR-121 <br />Task description : Rip MDW roads approved in TR- 121 (previously approved PR-14) <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade ayr : Ceml_I Iniyeroal <br />Alladimeul nu. I :RODS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br />Cost Breakdown : Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />MATERIAL QUANTITIES <br />Utilization % <br />$66.95 NA <br />$120.00 100 <br />$6.95 100 <br />$38.54 NA <br />$232.44 Total fleet cost/hour : $929.76 <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA <br />Area : 5.04 <br />NA <br />acres <br />Load factor : NA Bank volume : NA BCY <br />Rip depth (ft) : 2.00 Volume : 16,262 BCY or CCY <br />Source of estimated quantity :Exhibit 80, TR-121, Project Details <br />Source of estimated load factor : NA <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 1,436.70 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 1.00 feet/pass Site altitude : 7,100 feet <br />Average ripping width : 7.67 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />° Average ripping length : 500.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.891 acres/hour Adjusted unit production : 1,192.46 cu. yds./hour <br />Unadjusted production : 1,436.70 cu. yds./hour Adjusted fleet production : 4,769.83 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) Total job time : 3.41 hours <br />Unit cost : $0.195 per cu. yd. Total job cost : $3,170 <br /> <br />Permit/job # : C-80-007 <br />Abbreviation :none <br />Filename: C007-21B