My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-06_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2010-07-06_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:14:57 PM
Creation date
7/12/2010 11:32:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
7/6/2010
Doc Name
Preliminary Adequacy Review
From
DRMS
To
Mountain Coal Company
Type & Sequence
TR121
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 211 <br />Date : 0710612010 <br />User: TAK <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County :Gunnison <br />Site :West Elk Mine <br />Agency or organization name : CDRMS <br />Permit or other job action : TR-121 <br />Task description : Regrade MDW pads approved in TR-121, not previously approved in PR-14 <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cob Shiftbasis : 1 par day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $67.84 NA <br />Operating cost/hour : $119.93 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $226.31 Total fleet cost/hour : $905.25 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,420 CCY factor : 1.165 volume : 2,819 LCY <br />Source of estimated volume :1.5 acres X 10 feet thick <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-ro <br />Push gradient : 0.97 (Cat HB) <br />Average push gradient: 2.00 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 7,900 feet Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.33 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 406.87 LCY/hr <br />Adjusted fleet production : 1,627.47 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 1.73 Hours <br />Unit cost : $0.556 /LCY Total job cost : $1,568 <br />Permit/job# : C-80-007 <br />Abbreviation : none <br />Filename :0007-211
The URL can be used to link to this page
Your browser does not support the video tag.