My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-06_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2010-07-06_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:14:57 PM
Creation date
7/12/2010 11:32:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
7/6/2010
Doc Name
Preliminary Adequacy Review
From
DRMS
To
Mountain Coal Company
Type & Sequence
TR121
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task #: 21G <br />Date : 0710612010 <br />User: TAK <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />Agency or organization name: CDRMS <br />Permit or other job action : TR-121 <br />Task description : Rip MDW pads approved in TR-121, not previously approved in PR-14 <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade tvna • Rami_llniversal <br />Attachment no. 1 :ROPE Cab Shill bdsis. 1 Nel ddy <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $66.95 NA <br /> Dozer operating cost/hour : $120.00 100 <br />Ripper operating cost/hour : $6.95 100 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $232.44 Total fleet cost/hour : $929.76 <br /> <br />MATERIAL QUANTITIES <br /> Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 1.50 acres Rip depth (ft) : 2.00 Volume : 4,840 BCY or CCY <br /> <br />Source of estimated quantity : Exhibit 80, TR-1 21, Project Details _ <br />Source of estimated l oad factor : NA <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 1,436.70 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 1.00 feet/pass Site altitude : 7,100 feet <br />Average ripping width : 7.67 feet/pass Altitude adjustment : 1.00 (Cat HB) _ <br />Average ripping length : 500.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.891 acres/hour Adjusted unit production : 1,192.46 cu. yds./hour <br />Unadjusted production : 1,436.70 cu. yds./hour Adjusted fleet production : 4,769.83 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) Total job time : 1.01 hours <br />Unit cost : $0.195 per cu. yd. Total job cost : $943 <br /> <br />State : Colorado <br />County : Gunnison <br />Site :West Elk Mine <br />Permit/job # : C-80-007 <br />Abbreviation :none <br />Filename :0007-21G
The URL can be used to link to this page
Your browser does not support the video tag.