Laserfiche WebLink
J. J. Dudash -11 - July 8, 2010 <br />In the cover letter for the June 1, 2010 submittal, BRL stated that they would <br />perform field work in June that would respond to CHS's concerns. The results of <br />the field work will be forwarded to the Division when available. <br />New Adequacy Review Question <br />88. Please clarify the status of the bench piezometers at the East Mine. If they are <br />still capable of being monitored, please add them to the monitoring station list. <br />BRL - The bench piezometers at the East Mine were installed to monitor the <br />stability of the benches. BRL cannot understand why data from the <br />piezometeres would be applicable the PR-12 west mine plan. The East Mine is <br />not within the proposed west mine permit boundary. <br />Sincerely, <br />J. E. over, P. . <br />Consulting Engineer <br />cc: Wm. A. Bear, Jr. <br />Bureau of Land Management <br />USDA-FS <br />Paonia Library <br />Attachments <br />Volume I <br />Pages 2.03-7, 2.04-21, 22, 26, 34, 37, 48 2.05-2, 3, 84, 87, 118, 120, 121, 122, 123, 124 <br />144, 146, 149, 157, 158. <br />Volume II <br />Map 9 <br />Volume III <br />Replace the June 2008 HydroGeo's report with the September 2008 HydroGeo Report in <br />Exhibit 3 of Volume III. <br />Baseline Water Monitoring Data - Eleven amended sheets