Laserfiche WebLink
Project: ........................................ ........,.......... ...- ............ <br />GEOTECH <br />: . Client / On Site Rep: <br />Bowie Resources / Basil Bear <br /> <br /> <br />Bowie Mine Gob Pile Stability <br />.......................... <br />:........................................... ....... <br />................................................................................................... <br />Civil, Structural & Geotechnical Engineers <br />CO 81401 <br />• Momrose <br />222 South Park Ave <br /> <br />Contractor Rep: <br />Bowie Resources /Tracy M. <br />Project NO: <br />2005126-CMT Date: <br />4/21/2010 , <br />. <br />Ph.: (970) 249-6828 • FAX: (970) 249-0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />G..Jones <br />DAILY CO MPACTION REPORT <br /> LOCATION TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NOT SOIL LAB SAMPLE <br />TEST <br />NUMBER GRADE ELEV <br />NUC <br />SAND DENSITY <br /> <br />(pcf) MOISTURE <br /> <br />CONT. (%) DENSITY <br /> <br />(Pcf) CONTENT <br /> <br />(%) COMPACTION WITHIN <br /> <br />spec TYPE NUMBER <br />356 (PT#4502) N19367.70/E37711.72 6084.4 X 101.6 9.6 99.5 9.6 97.9 gob 333 & 336 r/c 0219/o <br />357 (PT#4503 N19294.14/E37561.93 6079.0 X 109.1 10.6 106.5 10.7 97.6 gob 358 r/c 020% <br />358 (PT#4504) N19348.87/E37543.02 6083.7 X 99.8 9.9 95.7 14.6 95.9 gob 339 & 340 r/c 021% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVATION /TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction Cohesive Soils <br />Requirement: 90%+ Cohesionless Soils Full Time: Day. <br />S M T W <br /> <br />X Th F S <br /> <br />Sheepsfoot: <br /> Part Time: A Weather: Sun Clear Overcast Rain Snow CAT 815 <br />Specified x X Smooth Drum Roller: <br />Moisture N/A Cohesive Soils <br />Requirement: Cohesionless Soils Number of Site Visits/Day: Temp: To 32 32-50 50-70 <br />X 70-85 85 Up <br />Vibratory: <br /> Testing Only: Wind:, SNIT Mod High <br /> Requested By (Company Name): X Other (List Below): <br />Laboratory Testing ASTM - Cohesive Soils <br />Procedure: D 698 <br />Cohesionless Soils B. Bear/ Bowie Resources Humidity: Dry <br /> <br />X Mod Humid <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: Insufficient amount <br />of material placed. informed (Rep of Company) of Test Results: <br />B. Bear & Tracy Matekovic / Bowie Resources <br />Buckhom was not informed prior <br />Contractor Not Working Due To: The Contractor Is: to our arrival on site that the <br />contractor would not be working <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br />Processing Frozen Material: ?Processfno wet material: <br /> <br />Stripping and/or Grubbing: ?Moisure Condrtrontno Dry Mat'l: Field Copies Given To: <br /> <br />Contractor: <br />Client: on this date. <br /> <br />Unknown: <br />Stockpiling Fill: =Removing Unsuitable MatT CM/GM: <br />Other: PAGE 1 OF 1 <br />05-126-CMT Bowie Mine No. 2 Gob Pile Stability.xis DCR4-21-10gj#356