My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-06_REPORT - C1996083 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2010-07-06_REPORT - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:14:57 PM
Creation date
7/7/2010 1:29:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REPORT
Doc Date
7/6/2010
Doc Name
2nd Quarter 2010 Gob Pile Stability
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: <br />= GEOTECH. <br />: Client I On Site Rep: <br />Bowie Resources / Basil Bear <br />Bowie Mine Gob Pile Stability : ............................................................................ <br />Civil, Structural & Geotechnical Engineers <br />222 South Park Ave <br />• Montrose <br />00 81401 Contractor / Rep: <br /> <br />Bowie Resources /Tracy M. <br />Project No: <br />2005126-CMT Date: <br />6/9/2010 . <br />, <br />Ph.: (970) 249-6828 • FAX:.(970) 249.0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />G. Jones <br />DAILY CO MPACTION REPORT <br /> LOCATION TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NOT SOIL LAB SAMPLE <br />TEST <br />NUMBER GRADE ELEV NUC SAND DENSITY <br />(pcf) MOISTURE <br />CONT. (%) DENSITY <br />(l?cf) CONTENT <br />(%) COMPACTION WITHIN <br />SPEC TYPE NUMBER <br />377 (PT#4523) N19183.43/E37924.85 6049.0 97.3 10.9 91.9 10.4 94.4 330A & 335 r/c 0 160/ <br />378 PT#4524) N19446.53/E38180.54 6058.0 102.3 10.1 93.8 11.4 91.7 356 r/c @ 19% <br />379 PT#4525) N19357.91/E37645.93 6090.0 98.3 10.1 96.7 . 12.5 98.3 339 &,340 r/c 0 17% <br />380 (PT#4526) N19288.40/E37427.20 6078.9 101.9 9.5 98.0 10.0 96.1 339 & 340 r/c @25% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVATION / TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction Cohesive Soils <br />Requirement: 90%+ Cohesionless Soils Full Time: Day: S M T W <br />X Th F S <br />Sheepsfaot: <br /> Part Time: F X-1 Weather: Sun Clear Overcast Rain Snow CAT 815 <br />Specified X X. Smooth Drum Roller: <br />Moisture N/A Cohesive Soils <br />Requirement: Cohesionless Soils Number of Site Visits/Day: Temp: To 32 32-50 50.70 70-85 <br />X 85 Up <br />Vibratory: <br /> Testing Only: Wind: Still Mod High <br /> Requested By (Company Name): X Other (List Below): <br />Laboratory Testing ASTM Cohesive Soils <br />Procedure: D-698 <br />Cohesionless Soils Tracy Matekovic / Bowie Resources Humidity: Dry <br /> <br />X Mod Humid <br />DENSITY / COMPACTION <br />ON THIS DATE FOR TESTING WAS NOT PERFORMED <br />THE FOLLOWING REASONS: l Insufficient amount <br />of material placed. Informed (Rep of Company) of Test Results: <br />Tracy <br />Buckhom was not informed prior <br />Contractor Not Working Due To: The Contractor Is: to our arrival on site that the <br />contractor would not be working <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br />Processing Frozen material: Processing wet material: <br /> <br />Stripping and/or Grubbing: ?Masture Conditioning Dry mat'l: Field Copies Given To: <br /> <br />Contractor: <br />Client: on this date. <br /> <br />Unknown: <br />Stockpiling Fill: ?Removing Unsuitable Marl: CM/GM: <br />Other. PAGE 1 OF I <br />05-126-CMT Bowie Mine No. 2 Gob Pile Stability.xls DCR6-9-10gj#377
The URL can be used to link to this page
Your browser does not support the video tag.