Laserfiche WebLink
Project: - <br />' GEOTECH <br />. Client / On Site Rep: <br />Bowie Resources j Basil Bear <br />Bowie Mine Gob Pile Stability :............................................................................ <br />Civil, Structural & Geotechnical Engineers <br />CO 81401 <br />- Montrose <br />222 South Park Ave Contractor /Rep: <br />Bowie Resources / Tracy M. <br />Project No: <br />2005126-CMT Date: <br />6/3/2010 , <br />. <br />Ph.: (970) 249-6828 • FAX: (970) 249.0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />G. Jones <br />DAILY CO MPACTION REPORT <br /> LOCATION TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NOT SOIL LAB SAMPLE <br />TEST <br />NUMBER GRADE ELEV NUC SAND DENSITY <br />(pcf) MOISTURE <br />CONT. (°/o) DENSITY <br />(pCf) CONTENT <br />f%) COMPACTION Wrl-HIN <br />SPEC TYPE NUMBER <br />373 (PT#4519) N19318.83/E38183.52 6029.3 X 106.0 9.6 95.8 13.7 90.3 gob 354 & 355 r/c 0 24% <br />374 (PT#4520) N !9464.55/E38186.61 6057.0 X 103.3 10.3 97.3 10.5 94.2 gob 354 & 355 r/c @ 19% <br />375 (PT#4521) N19310.73/E37948.93 6056.4 X 99.2 . 10.4 93.8 12.1 94.5 gob 356 r/c @ 17% <br />376 (PT#4522) N19294.39/E37389.13 6075.8 X 100.2 9.9 93.7 10.5 93.5 gob 339 & 340 r/c 021% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE i DENSITY SPECIFICATIONS OBSERVATION / TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction 90% } Cohesive Soils <br />Requirement: Cohesionless Soils Full Time: Day: S M T W Th <br />X F S <br />Sheepsfoot: <br /> Part Time: F 7X Weather: Sun Clear Overcast Rain Snow CAT 815 <br />Specified x X Smooth Drum Roller; <br />Moisture N/A Cohesive Soils <br />Requirement: Cohesionless Soils Number of Site Visits/Day: Temp: To 32 32-50 50-70 70-85 <br />X 85 Up <br />Vibratory: <br /> Testing Only: VA Wind: Still Mod High <br /> Requested By (Company Name): X Other (List Below): <br />Laboratory Testing AST M <br />Procedure: D- 698 Cohesive Soils <br />Cohesionless Soils <br />Tracy Matekovic / Bowie Resources <br />Humidity: <br />Dry <br />X <br />Mod <br />Humid <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: Insufficient amount <br />of material placed. Informed (Rep of Company) of Test Results: <br />Tracy M. <br />Butkhom was not informed prior <br />Contractor Not Working Due To: The Contractor Is: to our arrival on site that the <br />contractor would not be working <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br />Processing Frozen Material: Processing wet material: <br /> <br />Stripping and/or Grubbing: ?Molftre Conditioning Dry Mat'I: Field Copies Given 70: <br /> <br />Contractor: <br />Client: on this date. <br /> <br />Unknown: <br />Stockpiling Fill: =Removing Unsuitable Marl: E=] CM/GM: <br />Other: PAGE 1 OF I <br />05-126-CMT Bowie Mine No. 2 Gob Pile Stability.xis DCR6-3-10gj#373