My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-06_REPORT - C1996083 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2010-07-06_REPORT - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:14:57 PM
Creation date
7/7/2010 1:29:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REPORT
Doc Date
7/6/2010
Doc Name
2nd Quarter 2010 Gob Pile Stability
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: ....................... .................. ^T_............., <br />• ' GEOTECH <br />: <br />: Client / On Site Rep: <br />8owie Resources I Basil' Bear <br /> <br />Bowie Mine Gob Pile Stability <br />............................................ <br />.......... <br />:..................... <br />.................... ............. .................. <br />Civil, Structural & Geotechnical Engineers <br />222 South Park Ave <br />• Montrose <br />co 61407 <br />Contractor / Rep: <br /> <br />8owie Resources /Tracy M. <br />Project No: <br />2005126-CMT Date: <br />5/27/2010 . <br />. <br />Ph.: (970) 249-6828 • FAX: (970) 249.0945' <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />G. Jones <br />DAILY CO MPACTION REPORT <br /> LOCATION TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT' NOT SOIL LAB SAMPLE <br />TEST <br />NUMBER GRADE ELEV NUC SAND DENSITY <br />(pcf) MOISTURE <br />CONT. (%) DENSITY <br />(pcf) .. CONTENT <br />(%) COMPACTION WITHIN <br />SPEC TYPE NUMBER <br />370 (PT#4516) N19276.77/E37966.25 6053.3 X 104.5 9.6 98.6 11.8 94.3 gob 356 r/c 0 27% <br />371 (PT#4517) N19343.69/E38062.26 6054.4 X 102.0 - 9.6 102.3 13.8 100.2 . gob 339 & 340 r/c @ 23°0 <br />372 (PT#4518) N19329.00/E37608.37 6086.0 X 104.5 10.2 100.3 11.4 95.9 gob 354 & 355 r/c 0 21% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVATION /TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction Cohesive Soils <br />Requirement: 90%+ Cohesionless Soils Full Time: Day: S M T W Th <br />x F. S <br />Sheepsfoot: <br /> Part Time: [ X-1 Weather: Sun Clear Overcast Rain Snow CAT 815 <br />Specified X X. Smooth Drum Roller: <br />Moisture N/A Cohesive Soils <br />Requirement: Cohesionless Soils Number of Site visits/Day: Temp: To 32 32-50 50-70 70-85 <br />X 85 Up <br />Vibratory: <br /> Testing Only: Wind: still Mod High <br /> Requested By (Company Name): X Other (List Below): <br />ASTM Laboratory Testing <br />Procedure: p- _ 69 698 Cohesive Soils <br />Cohesionless Soils <br />Tracy Matekovic / Bowie Resources <br />Humidity: <br />Dry <br />X <br />Mod <br />Humid <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: l Insufficient amount <br />of material placed. Informed (Rep of Company) of Test Results: <br />Basil Bear & Tracy Matekovic <br />Buckhorn was not informed prior <br />Contractor Not Working Due To: The Contractor Is: to our arrival on site that the <br />contractor would not be workin <br /> <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br /> <br />Processing Frozen Material: Processing Wet Material: <br /> <br />Stripping and/or Grubbino-. =Moisture Conditioning Dry M,afl: <br />Field Copies Given To: <br /> <br />Contractor: <br />Client: g <br />on this date. <br /> <br />Unknown: <br />Stockpiling Fill: =Removing Unsuitable Mat): CMJGM: <br />Other: PAGE 1 OF 1 <br />05-126-CMT Bowie Mine No. 2 Gob Pile Stability.xls DCR5-27-10gj#370
The URL can be used to link to this page
Your browser does not support the video tag.