Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year 2009 <br />LORENCITO CANYON MINE C-96-084 New Elk Coal Company LLC <br />mine name permit # Permittee <br />Address: 122 West First St, Trinidad, CO 8108:' <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Category Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed 15 5 .6 + 0.0 _ 15 5 . 6 <br />Acres backfilled and graded 12 2 . 1 + 0.4 = 12 2 . 5 <br />Acres to soiled 12 3 . 5 + 0.4 _ 12 3 . 9 <br />Seeding typically begins the minimum 10 year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final. Phase III release. <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total year Total' less ears' <br />Acres seeded' 12 3 . 5 + 0.4 = 12 3 . 9 _ 12 3 .9 + 0.0 <br />"include, if necessary, a description of any augmented seeding or cultural practi <br />ces <br />For the Entire Life of Mine, the total number of acres disturbed 15 5.6 and the total number of acres: <br />Phase I released 12 2 . 1 Phase ii released 0.0 Phase III released 27.2 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed 1.8 <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities z <br />5.9 <br />Acreage in active mining areas 3 0.0 <br />(exclude acres where Phase III release has been achieved) <br />z Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and kcal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded