Laserfiche WebLink
McClane Canyon Mining LLC <br />Water Sampling Report <br />Date: 06/25/2010 <br />Weather Conditions: Clear, 70 - 80 degrees F. <br /> Surface Water <br />Sample <br />Point Time Flow <br />cfs PH EC <br />umhos/cm Temp (C) <br />p <br />SW-1 9:40 AM 2.3 8.6 1780 14.1 <br />SW-2 9:43 AM D - - - <br />SW-3 8:50 AM D - - - <br />SW4 8:00 AM D - - - <br />SW-5 10:10 AM D - - - <br />SW-6 - 9:00 AM D <br />SW-7 9:00 AM D - - - <br />SW-8 8:15 PM 0.2 8.8 2100 11.9 <br /> <br /> Ground Water <br />Sample <br />Point Time SWL <br />feet H <br />p EC <br />umhos/cm Tem C <br />p <br />GW-1 9:20 AM 9.6 7.7 4100 12.2 <br />GW-3 8:40 AM 39.6 7.4 4500 13.2 <br />GW-6 8:55 AM Dry-18.8' <br />GW-9 9:45 AM 26.2 7.6 8500 13.6 <br />Location of Points/Wells <br />SWA East Salt Creek above McClane under haul road bridge <br />SW-2 McClane Creek at culvert below mine <br />SW-3 Munger Creek at haul road culvert below mine <br />SW-4 East Salt Creek -2 miles downstream of SW -8 <br />SW-5 McClane Creek above mine site at culvert inlet <br />SW-6 Munger Creek below mine before north split <br />SW-7 Munger Creek above Mine <br />SW-8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW-X McClane Creek at confluence with East Salt Creek <br />Second Quarter 2010 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />GW 1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW-3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW 6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW-9 Alluvium of East Salt Creek below proposed waste rock disposal area - TD 53.5 <br /> Feet <br />GW-1 Total Depth 14.3 <br />GW-3 Total Depth 47.3 <br />GW-6 Total Depth 18.8 Depth revised when pipe was damaged <br /> during gob pile construction. <br />GW-9 Total Depth 53.5 <br />? Q? ®eeeee.ee Er <br />Q ? ?s <br />jo m s <br />o m e `?// ®®?? <br />m•??®s •eee•°'e??®?P <br />o?•??OPIAEa m