My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-06_REVISION - C1981008 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2010-07-06_REVISION - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:14:57 PM
Creation date
7/6/2010 9:55:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
7/6/2010
Doc Name
Review & Revised Section for Permit Revision
From
USDA NRCS
To
DRMS
Type & Sequence
PR6
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />any areas that may be poorly drained, tillage will be timed in order to reduce bogging, excessive <br />compaction and excessive cloddiness caused by tillage when soils are wet. The best period for <br />tillage in these areas may be in the early spring prior to the irrigation season (prior to mid-April). <br />(For flood irrigated areas) - A plow pulling a standard marker will create furrows of <br />approximately 4" to 6" depth on 30" centers, which is standard for the gated pipe used for the <br />flood irrigation. <br />7. Initial Fertilizer Application - Based on the results of the fertility testing, fertilizer of the <br />designed type will be applied at the rate specified from the lab testing. The fertilizer is in solid <br />form and will be applied by small tractor with a broadcast spreader. The fertilizer will be applied <br />in the Spring of the same year that the initial fertility testing is done. Ongoing fertility testing after <br />initial seeding is described in Section 2.05.4(2)(e) Revegetation. <br />13.3 Dryland Pasture Seedbed Topsoil Preparation Procedures <br />a) For areas less than 15% slope, where irrigation may be used in the future if water becomes <br />available, the following procedures will be followed: <br />1- Ripping - Prior to replacement of the single lift topsoil, the graded spoil (Bench 1 material) will <br />be ripped to reduce compaction. This will be done to a depth of 2 feet. This will be done by <br />dozer with rippers or a chisel plow. <br />2 - Land leveling - WFC uses a blade of 16' to 24' width pulled behind a farm tractor to level the <br />topsoil surface and allow a smoother surface for seeding. <br />3 -Rock picking - WFC will use a mechanical device such as a Vermeer rock picker that is <br />pulled behind a tractor that rakes up large rocks over approximately 2.5 inches in diameter. <br />Rocks up to approximately 24" diameter can be picked up by the device. The rocks are removed <br />from the field. <br />4 - Fertility testing - This test is conducted within 3 months of topsoil placement. Three soil <br />samples will be obtained from the top 2 feet of soil in the field to be tested. The field is basically <br />defined as that area that has recently been topsoiled. Samples will be taken and analyzed by a
The URL can be used to link to this page
Your browser does not support the video tag.