Laserfiche WebLink
SNOWCAP COAL COMPANY <br />PHASE I, II & III BOND RELEASE <br />UTL INDUSTRIAL ACREAGES <br />COST SUMMARY <br />DRMS DRMS TOTAL <br />TASK # TASK HRS DESCRIPTION JOB COST (DRMS Est) <br />005 5.22 Backfill & Regrade Railroad Spur Area (Note 1) $4,091.00 <br />006 131.36 Backfill & Regrade Unit Train Loadout Area $102,426.00 <br />021 45.44 Haul footprint of ULT coal stockpile to CRDA #1 $35,427.00 <br />036 41.09 Rip UTL (Note 2) $26,648.00 <br />039 9.13 Rip/Scarify UTL prior to Topsoil Replacement (Note 3) $5,921.86 <br />102 3.03 Replace Topsoil to Overland Conveyor Area (Note 4) $2,359.00 <br />103 2.43 Replace Topsoil to RR Spur Area (Note 1) $1,896.00 <br />121 15.47 Sealing of UTL-01,02,03,04 (4 Wells) $5,021.23 <br />121 15.47 Sealing of RSN, UTL, North Decline & RSS Wells (4 Rollins Wells) $4,976.08 <br />130 85.80 42.9 Acres Drill Seed-UTL & Remainder of Conv Corridor (Note 5) $57,168.00 <br />135 Truck Scale $472.50 <br />135 Scale Buildinge $107.52 <br />135 Reclaim Tunnel Walls $45,135.00 <br />135 Reclaim Tunnel Floor $22,567.50 <br />135 Reclaim Tunnel Roof $22,567.50 <br />135 Loadout Feed Conveyor $24,315.50 <br />135 Loadout Building $44,100.00 <br />135 Loadout Building Pad $1,616.00 <br />135 Loadout Building Footing $1,858.50 <br />135 Powerlines to UTL $15,239.90 <br />135 Misc Building $1,050.00 <br />135 Misc Building Pad $1,262.50 <br />135 Misc Building Footing $885.00 <br />135 Railroad Track (Note 6) $66,730.95 <br />135 Ballast (Note 7) $3,403.00 <br />135 Transformer/Substation @ Cameo (Original power source of UTL) $1,680.00 <br />135 Transformer/Substation Pad $4,040.00 <br />135 Transformer/Substation Footing $2,301.00 <br />135 Remove Transformer $2,500.00 <br />135 12" Culvert - 40' (Haul Rd 3) $288.00 <br />135 18" Culvert - 275' (Haul Rd 3, Lght Use Rd 4 & LO Facility Area) $2,499.75 <br />135 30" Culvert - 170' (Pond 1 & 2 Dewater Location) $3,391.50 <br />135 Location Adj of 99.2% of Task 135 - (Note 8) -$2,144.10 <br />SL-7 7/10