My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-30_INSPECTION - M1999018
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1999018
>
2010-06-30_INSPECTION - M1999018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:14:13 PM
Creation date
7/6/2010 9:11:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999018
IBM Index Class Name
INSPECTION
Doc Date
6/30/2010
Doc Name
Inspection report
From
DRMS
To
Wagner Construction, Inc.
Inspection Date
6/7/2010
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : DRMS <br />Permit or job action 110c Sand and gravel; stone <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a -Demolition of scale house demolish 1 8.0 $327 <br />02a -Grade north slope to 3H:1V; backfill pit to create level work area dozer 1 34.2 $8,341 <br />03a -Topsoil application over 2.6 acres dozer 1 1.3 $351 <br />04a -Revegetation of 2.6 acres revege 1 40.0 _ $1,847 <br />05a -Mobilization of crew and equipment mobilize 1 2.7 $509 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 86.3 $11,375 <br />* includes inflation factor adjustment of : NA % TOTAL DIRECT COST * =11,375 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $230 <br />Performance bond : 1.05 % of direct total = _ _ $119 <br />Job superintendent : NA* NA NA total = NA <br />Profit : 10.00 % of direct total = $1,138 <br />* not required (or eqp. operator serves as super.) TOTAL O & P = $1,487 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct+ O & P) = $12,862 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $643 <br />CONTINGENCY - NA- NA total = NA <br />* contingencies accounted for at task level TOTAL INDIRECT COST = $2,630 <br />TOTAL BOND AMOUNT (direct + indirect) _ $14,005
The URL can be used to link to this page
Your browser does not support the video tag.